modela Posted July 23, 2013 Report Posted July 23, 2013 Alas, progress on the bridge. The picture above shows the crane placing the second truss after the first one was set and braced. The pond is low now as you can see with the worker standing on the floating center portion. Water at the high mark of the year can and often does go beyond the lower level of the bridge. We could see how level the end posts were when it was rising by the water level at each end. Getting the crane in was not an easy task even though some of the trees and vegetation had been removed. Once in, however, the operator did a masterful job with extending the hydraulic boom out and placing the trusses. This picture shows the two trusses in place. Angle braces on the outriggers stabilize the trusses. The tops are spanned by 4X6 pressure treated lumber. A welder attached the shoes (foreground) on one end. The shoe at the other is not fixed so it can have some movement while being restrained by specially designed brackets. This starts the final stage of cross bracing above and below, attaching railing, and connecting the bridge ends to the paths. There is a lot to accomplish but this is probably the biggest hurdle we had to overcome. Our thanks to a local bridge contractor that provided the certified welder and three other crew members plus another commercial contractor who provided additional manpower. What a difference a day made. 1 Quote
LoneRider Posted July 24, 2013 Report Posted July 24, 2013 Looks to be a pretty bridge. Will it be accessable by the public? Quote
modela Posted July 24, 2013 Author Report Posted July 24, 2013 Looks to be a pretty bridge. Will it be accessable by the public? Mount Pisgas is definitely open to the public including this bridge. This is the third generation bridge, the last one being made with two very large glue-lam beams. It was condemned about four years back. This is the one replacing it and we are shooting for mid September for it to be fully ready to go. I worked today with a carpenter doing the lower x-bracing below the decking. One of the big thrusts is scholarships for unfortunate kids to go through a summer camp where they camp and learn about nature. There are also many guide trips for young kids. My wife is a guide on the outdoor trips. Jim Quote
LoneRider Posted August 2, 2013 Report Posted August 2, 2013 Mount Pisgas is definitely open to the public including this bridge. This is the third generation bridge, the last one being made with two very large glue-lam beams. It was condemned about four years back. This is the one replacing it and we are shooting for mid September for it to be fully ready to go. I worked today with a carpenter doing the lower x-bracing below the decking. One of the big thrusts is scholarships for unfortunate kids to go through a summer camp where they camp and learn about nature. There are also many guide trips for young kids. My wife is a guide on the outdoor trips. Jim Very cool. When you get it done, please post some more pictures and an exact location. And hey, maybe somepoint in my travels I will be able to drop in a look at it. For some reason I really like bridges. If I can, I will have to dig up the pictures of a bridge I built about 15 years ago. It was a mix of truss/suspension foot bridge that spanned about 20'. I actually got to use some of the stuff I learned in statics class :-) Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.