New shop build in the spring. 24x30

Featured Replies

Right now, my shop is in a two car garage that is in rough shape. I have a 24x30 pole barn that I haven't been using. Right now it is a pea gravel floor and has a coue horse stalls. The roof has a dozen 1/4" holes ( looks like someone shot it but probably just recycled metal?) I need to replace some metal and close up the openings for the horses and pull out the stall wood.

I'm considering doing a wood or concrete floor. I figure concrete should be about $2000. I'm trying to think about layout and whether I want to put power into the slab. I've been watching Marc's build. It is basically an empty shell. It's too far from the house to put in a bathroom, but 9 out of 10 bathroom trips could be solved by stepping around back.

With the shell up and electric from the street to the barn, how much $$ do you figure ill have to spend to get it operational? I was thinking $2k for floor and another 2k for insulating walls, ceiling, wire.

Not sure on the price Josh, but the more you do yourself, the more you can save. Sounds like a great project, remember to take lots of pictures

When I built my shop I thought about floor recepticles in my concrete, but than I went with cieling recepticles with drop down retractable cords I like these alot if you want to clean up it takes just a second to clear the cords. Last year I bought a new tablesaw with a 3hp motor that takes 220v power I just ran the power to where I wanted the saw to set, I ran the power to a box in the cieling put new plug ends on a retractable 12/3 power cord it works geat. I've built lots of pole building (I'm a carpenter by trade) if you can see pin holes in your roof metal it sounds like maybe the 1 1/2" vinyl backed insulation sheets might not be installed on the roof between the metal roofing sheets and framming if this barrier isn't in place or is ripped and hanging condensation will collect on the metal roofing, and drip down, and you'll hate it. If you have to put new metal up anyway install this insulation or reinstall it whatever the case vinyl side towards the shop space pull it tight before stapleing it to the framming than install the metal foofing, condensation problems will be averted. Now when you pour your shop floor once all the dirt work is done install a vapor barrier 4mil plastic sheeting will work fine over lap your seems by a foot or so. This will ensure that moisture will not wick up through the concrete floor, once the concrete is in place, and cured 2-3days after the pour put a good sealer over your floor this can be sprayed with a pump up sprayer, or rolled on. These few simple things will make a huge difference in you future moisture problems. Good luck sorry for rambling on hope some of this helps.

Here is what I'm talking about with the 1 1/2" vinyl backed insulation I'm installing it on my pole barn in this pic

post-2926-0-49084300-1299113970_thumb.jp

  • Author

Thanks hig. I didn't even think about condensation. The building it just bare metal over the trusses. The trusses are 2x4 on 4' centers, so I think they built it as cheap as possible. I will definitely have them add that insulation under the metal when I have it replaced/repaired. Do you think those trusses will be able to support a ceiling if I run boards perpendicular? I'm not sure how much strength they have to hold up a ceiling. Probably do 1/2"osb on the ceiling, with blown in insulation above it. The ceiling is 12'. Also have to add in the weight of light fixtures.

My dad mentioned putting in a post and I beam to lift stuff but I don't think it would be used often, and the post would be in the way. I think one those hf engine hoists would be better.

As far as DIY, I plan to do all the work besides concrete myself. My dad is a licensed general contractor so should have all the help I need. I don't do well with heights, so ill probably higher the roof fix done.

My ts is a SS a 3hp, jointer is a dj20 with a 2hp, drum sander is a 18" model takes 220. The rest is ur usual suspects but all 110. I plan to upgrade my planer to a 15-20" floor unit from the dw735, so ill plan power for that.

Josh on my shop I did all the planning so when I ordered the trusses I had them engineered for a cieling load I added 2x6 cieling joists hangered to the bottom cord of the trusses, and sheet rocked the cieling the 2x6 joists afforded me the oppertunity to insulate with r19 batts I laid 1/2" OSB, and have an attic space that extends the length of my shop. In answer to your question your barn sounds like it was used for livestock so your trusses are probly not engineered for a cieling load, a post in the middle of the truss bays would definately make it so you could hanger cieling joists off your trusses, but than you have posts in the middle of your clearspan. You can take some pics of the existing trusses take these to a truss company, and ask them is there a fix so you can have a cieling and not lose your clearspan it might be as easy as adding more webbing to your tusses ( the webbing is the 2x4's the make up the W in the middle of the truss) I'm not sure I've never added a cieling to an old barn.

post-2926-0-29465700-1299113400_thumb.jp

post-2926-0-18439100-1299113591_thumb.jp

post-2926-0-70200400-1299113441_thumb.jp

I bielive I may have misread you last post You said you trusses are on 4' centers so it sounds like you may have a post and beam structue is there a beam that the trusses set on? If this is the case than you have much more structure than I was envisioning, and each truss is carrying less load than a traditional pole barn where you trusses are only at your post location usually 12' OC than you have purlings that run lateraly instead of upand down these purlings are the lateral support that you attach you roof metal to. If i'm envisoning you building correctly you lateral support for your roof metal are 1x strapping possably 2x strapping? You may have enough support for a cieling, can you take some pics of the interior structure that would give me more of an idea of what we're talking about. Dave

  • Author

I'll take some pictures tomorrow. I won't be home until after dark tonight. On the side walls, there are 4 posts. There is a truss that sits on each one. in between the posts, there are 3 more trusses that sit on a 2x10 or 2x12. Maybe the right solution will be to add a couple trusses while the roof is off?

It was built as a horse barn, but i'd like to convert to woodshop. I think my budget would be about 6k for it up front. Fixing the metal and trusses $2k, floor $2k, and insulation and walls/wiring $2k. That would just be materials, since i can do all the work except the concrete.

FYI... make sure you have proper ventilation (in the probably near the ridge) if you plan on pouring concrete as your floor. Concrete is technically never fully cured.. it will always accept and release moisture. In the first year or so of the green concrete, it will kick out a lot of moisture and will wick up moisture from below (I suggest a moisture barrier between the dirt and the gravel base).

Now, I'm telling you this because in my detached garage with the mother-in-law apartment above, it did not have proper ventilation. The result was that during the first summer, the combination of moisture in the air, the moisture releasing from the concrete and the heat of summer (causing more humidity) turned that garage into a sauna. The end result of that was I had a pile of rusty tools.

As an architect, I should have seen that coming...but that is another story.

I would also remind you to think about adding some windows. You can get some from any old salvage joint. Your eyes will appreciate the natural light and the color selections of the products you produce will be much better.

One last thing... take a few minutes and think about your dust collection. You don't have to get it set up right this second, but plan a little bit ahead so that you don't build or place something that you might regret later.

Good luck! I'm jealous!!

Josh I think your stucture wouldn't pass a building inspection if one of those 2x12s ever broke under a snow load the whole roof would collapse also it looks in the picture like the 2x12 are just nailed into the posts so the entire roof is held up by the shear strength of the nails. What I would suggest to make this stucture safe is when your getting ready to pour the slab dig a thickened edge along the eve edges about 6" thicker than the rest of the slab the slab thickness should be about 4" thick so you would have essentially a 10" footing, after the concrete has been cured 2/3 days I would build a studded wall under those trusses with a treated bottom plate, and a double top plate the studs should be on at least 2' centers. The studded wall will also let you add additional trusses and it will also give you a place for insulation and you'll be able to add sheet rock or whatever for sheeting the walls. I hope this helps. If you look at the pictures of my building the trusses are bolted to the posts and a shear bloke is also bolted on under the trusses the whole roof load is carried at each post location each post is burried 4' in the ground and sitting on a 6" thick poured in place concrete in the bottom of each hole, the posts are essentially the foundation thats why they call this building style a pole barn.

Josh I also think this will be a great shop space. Good luck

  • Author

Thanks. I think you're right. I'm sure this was a backwoods construction. If I convert this to a shop, I will be here for the next ten years or so... If I'm going to be here ten years, I need to do it right. I like the idea of the studded walls and adding trusses. I subscribe to the do once, do right camp..

I'm sure ill have more questions over the next few weeks.

Hi Josh,

This is my first year in my 'repurposed building'. I originally built my current shop as a simple, open on 3 sides, machine storage shed- then I poured a slab for 1/3 of it, then I built raised (1" ply) floors for the rest (over a few years). All was well the summer I enclosed it all, then last winter the drip drip drip from condensation taught me a hard lesson... I pulled the roof off this past summer and put in a condensation barrier. I cheaped out and used 'double bubble foil insulation'- it was cheap and I am actually VERY pleased with the results. It think I did the whole shop roof insulation (28x36) for 500.00.

Not counting the shell that I built 6 years ago- with insulation, rough milled fir siding, wiring, fixtures, (free woodstove) metalbestos, I probably have 4500 in to it. and I did a LOT of bottom feeding.

Once your dry, everything else can be picked away at.

Also, go through the effort for a few windows. (recycling store or a glass company- find some free/cheap used windows- it's just a shop)

that's my two cents.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Who's Online (See full list)

  • There are no registered users currently online

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,010 Total Members
  • 3,644 Most Online
  • Lolli4 Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.