Skip to content
View in the app

A better way to browse. Learn more.

Woodworking Forums & Project Advice | Wood Talk Online

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

New shop floor for Christmas?

Featured Replies

OK this is early for me to be up after dialysis but my life got made even crazier. I apologize for jumping around but that is how my brain works right now. My shop used to be a garage and a stable before that. The garage/Stable was added to our house some 80 years ago. We don't know when the floor was added. We had the stone and mortar foundation we added a poured pier sister to add strength. When we did this we has some additional settling that cause the garage floor to crack. After the first year the cracks stopped spreading.  It has some 1/2" cracks and three patches of bad pitting that I think were caused by oil leakage. The crack canyons, my daughter's name for them, eat mobile base wheels and break them off.

 

The shop area had been insulated with foam and is scheduled to get heat and cooling radiator units next week and new lighting the following week. In addition, I am going in for a stomach surgery on the 18th and won't be allowed to work in the shop until mid January. Eight weeks of rehab are going to suck. 

 

The person who was contracted to do the radiator unit install called me with a opportunity to help both of us out. I trust his completely so he isn't trying to unload this on me. He really wants to make my shop better. Our daughters are good friends and our families do lots of stuff together even a couple of vacations. He got us our geothermal system as a demo from the manufacture.

 

His company had been contracted for a in slab install next week and the people cancelled on him today after 4:00 PM.  He has already placed the order with the concrete installer($800 deposit), prepaid for 18 yds of special concrete($1250), and they can't return the tubing, etc because they already have the loops plumbed and attached to rebar mesh.  He has offered to install it for minimum cost and get it done while I am laid up. He said that the deposit from the people who cancelled will cover about 75% of the materials cost. He says for proper install they need 60mm over the tubing and 30mm under the tubing. The tubing is 24mm.  He said about 6" for the new slab depending on slope of the space.

 

He has offered to eat the remaining cost of the tubing and etc if I pay for the concrete work, concrete, and the labour for his crew. He said that it would make our system more efficient with addition of the slab, because the slab will act as a heat sink absorbing changes in temperature. 

 

My wife is for it because of the added value to the home. She says that it will make us more money when we sell the house and move some place warmer. She also claims that the saw dust trapped in the cracks will attract termites. IDK.  The wife and I discussed having the shop cleared out and resurfacing the floor to be flat and level ourselves. Leveling compound would cost almost $2K. He says that he can get a semi trailer to store everything in over the time that the floor needs to cure(2-3 weeks depending on temperatures). He has a forklift and wants to put everything onto pallets. 

 

So much has happened this fall that my head is spinning.  Wife says that this way I won't be tempted to go out and do something and bust a set of stitches loose. The concrete company wants $1600 for all the concrete work. I asked and they are going to put in floor 3" conduit for running power lines, four inch dust collection lines, adjusting the garage doors to new height, and putting on a impact resistant top coat after the floor is cured. Their plan has expansion joints included so it should not crack again. The labour for the tubing installers is $500 for one day of install before concrete and $250 for final flush, attachments, and tuning the system. The concrete cost is $1250. 

 

$1600  Concrete Installers

  $750   In Floor Heating Installers

$1250  Concrete Materials

==========================

$3600 for new shop floor and heating and cooling.  

 

I haven't priced it but I think pouring a new slab would cost me more. And the cost of the radiator units was going to be 2/3rds of this. So the remainder is going to use up the wife's budget for me for Christmas. I think she is going to put me on a production schedule when I get back into the shop. 

 

So now they are going to empty the shop on Monday and do some work to break up and remove the old floor. They have a skid steer with a concrete saw and jack hammer. I will miss this because of my dialysis.

 

Tuesday they are going to build forms and layout the loops. They also have to do the electrical conduit and the main lines and branches for the DC. They are also going to pour a 10' ramp up to the garage so that there won't be a noticeable step up. The garage door company is coming to raise the garage doors. The doors have to be able to close or the slab will not cure right due to cold temps.

 

Wednesday they are going to pour the concrete while I am dialysis(I am tempted to skip and watch). They are estimating that it will take 15-18 yds of concrete to make the new floor. I like watching the concrete pumper trucks. 

 

Beyond that everything is up in the air. The girl says that I should get some velvet ropes and charge for shop tours when everything gets put back. 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,010 Total Members
  • 3,644 Most Online
  • Lolli4 Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.