Skip to content
View in the app

A better way to browse. Learn more.

Wood Talk Online

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Starting to plan my shop

Featured Replies

Not sure if this is an option for you as it will definitely cost but, when I did mine, I sheeted the outside with OSB, house wrap, and then installed metal.  Then on the inside, I used standard bat insulation and vapor barrier.  I also dry walled and finished the interior.  My building has been in use for nearly 15 years and it's doing great.  The roof was sheeted with OSB, 30# felt, and then the metal.    

  • Author

That's definitely one way to do it that makes sense to me Kev. But your right, that would drive the initial cost over my budget. This is something I have to do a few months from now...probably won't get done before this winter.

Mike, I'm interested in the insulation you mentioned above, that has a vapor barrier. Can you provide a link to your source?

This is the local place that sells it in wide rolls both unfaced and kraft faced. My plan was to use plastic sheathing between the insulation and OSB.

 

http://alliedinsulation.com/index.php/products/building

 

Here is a short article talking about insulation and vapor barrier. 

 

http://insulationsaver.com/insulation/kraft-faced-or-unfaced/

When I spoke to them they recommended R-19 unfaced for the walls which is $0.42 sq/ft and comes in 3, 4, 5, and 6' widths in 50' long rolls. Their plastic sheathing goes between the insulation and OSB and runs $0.04 sq/ft. If I go with R-38 blown in for the ceiling it is $0.37 sq/ft. 

 

Janello - when is your building scheduled? My materials are scheduled to be delivered around June 18th and hopefully my builder starts shortly after that. Keep in touch as we'll have to bounce idea/information off each other. 

  • Author

My contract says.....(brace yourself)....June 18th! But the rep said "a couple months". It's all contingent on the township approving drawings and the like. 

 

What mill plastic/visqueen are you going with? I can likely get that cheap through a rep I deal with at work. Are you renting equipment to blow in the insulation? I'm interested how you plan to do that if you go that route?

 

Confession to make. I just got home and checked, my contract says August 18th. I'm hoping they will get started before that though, he did say "a couple months". 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,009 Total Members
  • 3,644 Most Online
  • Joseph b Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.