Recommended Posts

  • 2 weeks later...
Posted

I've got that unit, and so far I like it well enough. I don't have a drum sander or anything too crazy and all I've been using it with is my table saw, jointer and planer and it seems to do a reasonable job. I've got two Rockler extendable length dust right flex hoses with blast gates that I use with the system and it works well enough for me. I think I'm similar in that my furthest run is probably a little under 15 feet. I've got no complaints thus far but if I do I'll be sure to report them. Good luck!

Posted
8 hours ago, Lt CHEG said:

I've got that unit, and so far I like it well enough. I don't have a drum sander or anything too crazy and all I've been using it with is my table saw, jointer and planer and it seems to do a reasonable job. I've got two Rockler extendable length dust right flex hoses with blast gates that I use with the system and it works well enough for me. I think I'm similar in that my furthest run is probably a little under 15 feet. I've got no complaints thus far but if I do I'll be sure to report them. Good luck!

Do you have the 2 hp unit?

Posted
2 hours ago, sjm1580 said:

Do you have the 2 hp unit?

Yes I do. I'm only just now having my shop insulated so my walls were open when I was buying equipment. It was super easy for me to run a dedicated 240 volt circuit for it. I've got my table saw and jointer on the same circuit as I won't be using both at the same time, but since I'll be using the dust collector with everything the dust collector is the only appliance on that circuit.

11 hours ago, Brendon_t said:

Cool.  look forward to hearing how it is.  

Lt. if you ever need more umf, get rid of those long flex runs. those things kill your flow. 

I eventually plan on running hard piping once my shop is a little more finished, and as the budget allows. I figure eventually I'll remove the two 4" line adapter and plumb hard pipe from the dust collector directly to a main overhead trunk line. I've got a pretty big shop space, but the initial budget didn't allow for a big shop space AND a well finished shop space so I'm making additions bit by bit. For starters my current setup didn't break the budget and worked passably so it was a starting point, but eventually I do plan on bigger non flex lines coupled with shorter flex runs. Once the insulation contractors are done and I have everything back where it belongs I'll try to post some pictures.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Who's Online   3 Members, 0 Anonymous, 63 Guests (See full list)

  • Forum Statistics

    32.1k
    Total Topics
    437.6k
    Total Posts
  • Member Statistics

    26,008
    Total Members
    3,644
    Most Online
    Bob44
    Newest Member
    Bob44
    Joined