Framing Question

Featured Replies

Hey Gang,

 

I am going to be (hopefully!) building a wall in my garage to wall off the back quarter of the garage into an extra large laundry room and the front my shop.

 

The thing is, the garage is "sunken", about 2 feet for so than the house. The walls are built on what I can only call concrete "retaining walls"
or bases, of a sort, making it so the garage has an extra high ceiling. This is of course a real plus, but leaves me at a bit of a loss about
the new wall I am building.

 

Isn't a standard wall about 8' high?  My walls are at least 10' or so.  Do I just frame the wall with 10' studs and not worry about it, or will I need to do something to the base of each stud to stabilize it better?

 

Thanks guys,

 

Milo

Milo, you guessed right. Just use longer studs. No extra stabilizing is necessary. Use standard framing techniques and pt lumber for your floor plate. Tie your bottom plate to the slab using anchors and your top plate into the ceiling joists using nails or screws. Since it is your garage, I would use Tapcons on the bottom plate and screws through the top plate so that you can easily remove the partition  if you wish to remodel.

10' studs won't be a problem you need to attach a treated bottom plate to your concrete floor I have a roto hammer drill, and drill a 1/4" hole through the bottom plate into the concrete and drive in what would be called a split pin these are sold in most hardware stores, or you can use 3/16 bit drill the same way, and you can use the blue concrete hex headed screw also at the hardware store. Now once the bottom plate is attached find a nice straight stud cut it so its long enough to just reach the ceiling set it next to the wall on both sides of the garage on top of the bottom plate, use your level and plumb this stud holding it against the wall find the point where the edge of the stud touches the ceiling mark this with a pencil find the same point on the other side. Snap a chalk line from point to point. now attach a top plate to the ceiling with the edge of it  on the chalk line using 16d nails into the ceiling joists or if the joists are running the wrong way ( I'm assuming the ceiling is sheeted with drywall) you can drill a 1/4" hole through top plate, and through the drywall in several places take the top plate down insert toggle bolts through the dry wall slide the top plate trough the toggles and tighten them up. once all of that is done cut your studs to length ( usually on concrete slab the length of studs may vary so measure often) now you just toe nail the studs in place top, and bottom on a 2x4 two nails at the top, and two at the bottom I nail the top first( this keeps to stud from falling on your noggin'). I might be giving you to much instruction but I don't know your skill level this is a pretty straight forward project, if for some reason you have no drywall on the ceiling, and the joists are going the wrong direction you can just cut some 2x4's that go between the joists at several locations and nail them in snap your wall line on to these than nail on your top plate. Hope this helps, and maybe answers some of your questions.   Dave

As higtron stated you want to build the wall in place. Don't attempt to build it on the ground and then stand it up. You will be using an entire months quota of cus words up in one afternoon.

Also, you can use two 16d (hand driven) nails into the same 1/4" hole to set your seal/bottom plate.

Sent from my BlackBerry 9900 using Tapatalk

  • Author

Dave (and everyone),

 

My woodworking skills are moderate -> good, but I've never done any framing.

 

I do have a couple of clarification questions:

 

A bottom plate is just pressure treated wood, correct?

 

HD or Lowes could show me split pins?

 

There is a space betwee the stud of the present wall and the edge of the concrete wall base the wall is sitting on.  Do I need to fill between the new wall I am building and the old wall?

 

Maybe these pics will help..

 

post-10429-0-38256000-1361042436_thumb.p

 

post-10429-0-76119700-1361042372_thumb.j

 

You may find slit pins at HD but I doubt it and even if they did you would be hard pressed to find the correct pimply face kid in an orange vest that would know where they were, if you have a local lumber yard that caters to contractors they would have them for sure possibly any Ace hardware store. I only use HD when I know what I want, and where to find it most of the time the staff isn't very knowledgeable.

Now for your stem wall problem  put your first stud up against the stem wall (concrete ledge) With your level plumb this stud up than toe nail it in place now put in the next stud plumb, and toe nail now take your level hold it against these two studs slid it to the edge of the garages bottom plate mark this location on the plate( this is what is referred to as planing) measure this short stud toe nail it into the top plate than face nail the stud into the bottom plate.

Yes for your bottom plate you want to use treated 2x4s for this if your planning on leaving this wall in place permanently, if it's a temporary wall regular 2x4's would work just remember sometimes temporary turns into permanent. Hope this helps  Dave

You also can refer to split pins as concrete anchors to hold your bottom plate to a concrete slab they will have a choice of anchors for this task they all will work one isn't that much better than any other anchor.

I normally plumb up the first stud than just pull the rest of stud measurments off of this stud now when you get to your door framing plum up your king stud now pull the rest of your door measurements off this stud remember your ruff opening is 2" bigger than your door, if your door is a 3' x 6'8" than your ruff opening would be 38"x 6'10". That gives you room for shimming up the door in the opening.

 

gallery_2926_762_207.jpg

  • Author

Hey, thanks for all the great information.  I will keep you updated.  1st step is to get the new storage until built, 2nd move all the garage junk into storage, 3rd is build new shop in garage!  If I am lucky, I MIGHT get it done by May! ;)

You can also rent a powder actuate gun and use yellow shot with 3" pins to secure the bottom plate. As everyone before has stated use PT for the bottom plate. Also when seething the bottom plate, make it one long run (may take two boards.) this allow you to keep your bottom plate straight. You can always come back and cut the plate out where the door is.

Use a sill gasket between the concrete and bottom plate.  Pressure treated or not, wood should never be in direct contact with concrete as moisture wicks through it.

Use a sill gasket between the concrete and bottom plate.  Pressure treated or not, wood should never be in direct contact with concrete as moisture wicks through it.

This is actually a belt and suspenders approach, but I always recommend it. The reason for this, and the pressure treated sill plate, is that concrete never fully cures and moisture moves in and out of it.PT lumber is water resistant (NOT water proof), which means the pores of the wood are filled with chemicals, immensely reducing, but not eliminating, its ability to absorb water... which is the source of rot and mold. 

 

Like Jim suggests, a sill gasket (on an exterior wall or top of foundation wall) or even a simple plastic strip between the wood and the concrete prevents creates a proper barrier, and your wood is protected. Depending on the age of your concrete, you might actually see condensation under the plastic. No worries. When the concrete is ready, it will absorb that water back and there is no organic material for mold to grow. The sill gasket helps to account for irregularities of the concrete.

 

One other thing... I like hightron's instruction. I was actually taught to set the top sill and drop a plumb bob to set the bottom sill and work top to bottom. I think his way is actually better. Lasers also help in all of this as well.

  • 1 month later...

As higtron stated you want to build the wall in place. Don't attempt to build it on the ground and then stand it up. You will be using an entire months quota of cus words up in one afternoon.

Also, you can use two 16d (hand driven) nails into the same 1/4" hole to set your seal/bottom plate.

Sent from my BlackBerry 9900 using Tapatalk

You actually can build the wall on the ground, attach a single 2x4 plate to the bottom of the trusses where you want the wall, build your wall 1 5/8 shorter than the overall dimension (floor to truss). Now you have that buffer for the extra height when standing your wall. Put the top under the top plate attached to the trusses, tap the bottom in. Your studs will twist less when nailed THROUGH the plates, layout will be easier and the overall build will be smoother. A double top plate is not needed but it eases construction, a couple extra two bys but less up and down the ladder and a better finished product, this method is commonly used in basement remodels, building walls vertical sucks... framing is fun, unless you have a princess hammer.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Who's Online (See full list)

  • There are no registered users currently online

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,010 Total Members
  • 3,644 Most Online
  • Lolli4 Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.