Skip to content
View in the app

A better way to browse. Learn more.

Wood Talk Online

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Need ideas for my workshop

Featured Replies

Now that I've gotten the insulation and sheetrock installed, and am finding a contractor to install a mini split AC, I need to layout my shop. I've got some ideas, but could use some feedback.

First the canvas. These are a 360 view of the shop before I moved my tools back into it. Lots of room I thought...

post-3855-0-23001400-1340034780_thumb.jppost-3855-0-00205800-1340034782_thumb.jppost-3855-0-96208200-1340034783_thumb.jppost-3855-0-95545800-1340034785_thumb.jppost-3855-0-12364400-1340034788_thumb.jp

Here is the shop with the tools placed in a tenative layout, with the motorcycle and wood rack's locations flipped.

post-3855-0-13126800-1340034790_thumb.jppost-3855-0-98904200-1340034791_thumb.jppost-3855-0-79517200-1340034793_thumb.jp

Currently I have my wood stored on a rolling wood rack you see in the pictures, which was great when everything was mobile, but takes up a 8' by 4' footprint if placed along the wall. I don't think I need the mobility any more, so I need to explore some other options for storing plywood, scraps and stick lumber in a more compact setup. I'm thinking plywood either stored horizontally with stick lumber above, or vertically on the end of the wall nearest the garage door with stick lumber over a sliding miter saw cutting station.

The rest of the wall where the table saw and sliding miter saws are standing currently would be committed to a countertop that would hold my benchtop drill press, drum sander, and possibly a mortiser at a future date. I was toying with having the drill press mounted to the counter so the same surface/fence setup for the miter saw could be used for the drill press. The table for the drill press would be fixed, with the motor portion raising up and down to adjust height. On the very end of the wall would be my Jet 1-1/2hp dust collector, with tubing run along the back of the counter for dust collection, and the primary dust collection vortex/garbage can living under the counter before heading to the collector. The remainder of the under countertop area would be committed to drawers or possibly a setup for storing systainers. Finally cabinets could be mounted near the ceiling for more tool storage in areas not committed to lumber or the AC.

The wall space between the shop door and shelves would be the area for tool storage via french cleats, possibly including clamps, though I'd like to store them near the workbench if possible.

The workbench works where it is, but I feel like it's a big waste of wall space and electrical sockets. If I could put the wood on the wall where the rack is, and the countertop along the wall with the door to the house, It might flow better, with the workbench being closest to the AC as well. Another change I've considered is splitting up the two shelves and placing one of them along the wall behind the motorcycle area as a dead storage for camping stuff that doesn't have to be as accessible. This would allow me to take up less space towards the center of the shop.

I also need space for a flammables cabinet, probably behind the motorcycle unless I come up with a better spot. I was also planning on building a mobile assembly table, but am not sure I have the space for one unless it can live under something. A final consideration is a planned purchase of a combo jointer/planer, probably a 12" model. This would be on a mobile base, but would need a home.

Any possibilities I'm missing? Other ideas that would help with this layout?

  • Author

One idea that just percolated up to the top. Take the Sjoberg workbench and the second Sjoberg that I have in my living room with my carving tools and place them along the wall opposite the garage door as countertops. They have vices built into the front already. I build a workbench to replace them and can still use them as counters as well as assembly areas.

I would definitely use a layout tool. It will help get you started and is easy to try different configurations.

(null)

==> I would definitely use a layout tool.

+1 .. sketchup is your friend. lay something out and post it... folks around here love to spend other's money on tools and lay other folks shops out...

  • Author

I used Grizzly's tool to get the initial layout, but I'm not liking it as much in the actual space. I have Sketchup, but I'm not very good with it yet.

I used the Grizzly tool, too. That in conjunction with a tape measure. Then I used blue tape to layout on the floor.

(null)

Another vote for grizzly. I used it to settle all of the ideas rattling around in my head. But the blue tape is such a good suggestion by Vic. Dwacker also used it in his reconstruction and it worked well.

Thanks, Dave! Btw, the blue tape is mostly to give you an idea of what it feels like to move between tools. Carry or pretend to carry a board. You need good ergonomics.

(null)

  • Author

Already had an epiphany moving things around with the Grizzly tool. My mobile sheet rack which is too honking big up against a wall might work a lot better sitting in front of the garage door. That gets it off that wall and leaves space for a crosscut station with stick lumber storage above. I could put a vertical plywood rack on the end if I decide the mobile rack is just too big.

When you mentioned "cargo doors" it reminded me of something I read on this forum. Think about your process of raw lumber into finished product, and arrange the shop to match that process. So, the wood rack goes near the cargo doors to make it easy to unload the truck. Then the tools you use to break down lumber and sheet goods go next to the lumber rack: track saw and table, CMS, etc. Then you have a table for the cut pieces (work bench?) , and place to put the off cuts (wood rack?). Then your jointer, planer, and table saw for milling and dimensioning. Then the rest of your tools, your assembly table, and finally your finishing area.

At each step you are close to the table with the pieces from the previous step, the tool, and the table with the pieces ready for the next step. You want to avoid carrying pieces back and forth, across the room and around tools.

post-1850-0-53460500-1340070894_thumb.jpI agree with Beechwood. There is a natural "FLOW" of work in every shop and you need to be setup so that FLOW is smooth. You should not have to traverse your shop several times throughout a project. I used Sketch-up. You can go to the sketchup library and get almost any piece of equipment to inport into your layout. You can make it look really close. I will put my sketchup below.
  • Author

Thanks guys, I am trying to do the workflow thing, which is why the lumber storage will be near the garage door. Stick lumber and plywood gets unloaded from the truck and placed right into storage. I have a knockdown grid I can use with my TS-55 for breaking down sheet goods. If I place the stick lumber over the crosscut station they can be taken down and cut to size right there. I'm not planning on using the TS for sizing, but more specialized operations.

As far as dimensioning, I've got a 10" benchtop jointer/planer which is on a mobile base. I'm anticipating getting a much larger 12" combo model to replace it, also on a mobile base but intended more to stay in one place.

Final finessing of dimensions will be towards the back wall, and assembly on the workbench or an assembly table if I can find the room for one.

I'm just fuzzy on the best shop furniture to build to achieve this. I think I'm sold on the miter saw crosscut station at the end nearest the doors, with a wood rack over that. Possibly mobile, but probably a fixed cabinet with drawers for extra storage. The question is if I try to include the drill press in a flip top there, or mount it on a countertop on the far wall. Also where the workbench will live is up in the air, I'm thinking next to the miter station on the first wall. I made a box in the Grizzly shop planner that indicates a 2' space larger than the workbench that indicates the area I'd need to be able to walk around it in.

If I put the lathe, drum sander and drill press on the countertop, that leaves enough room for the bandsaw in the far corner, though I'd prefer not to bury it in a corner where I'll have to wheel it out to work on long objects.

Wish I could share a picture of the Grizzly layout. Describing it in words probably doesn't come across very well.

I think the value of an efficient workflow is overrated for a hobbyist, garage-sized shop. Sure it's important for a production shop where efficiency translates to dollars and cents, and where there's going to be enough space to accommodate an efficient layout. But in a small shop used by a guy who still has his day job, I think there are other layout considerations that are more important than workflow. Consider these random points:

  • In a small, hobbyist shop, you're not dealing with tons and tons of lumber, and by definition it's going to be at most a few steps from any tool to any another. So it really doesn't matter if your jointer is on the other side of the room from your lumber storage. You're not going to be moving that much lumber, and it's just not that far.
  • If you find yourself putting one or more of your stationary machines on mobile bases so you can somehow achieve an efficient workflow, you've just shot yourself in the foot. It's far more trouble to move a big tool around when you need it (and then put it back when you're done) than it is to walk a few extra steps because your workflow isn't 100% optimal.
  • Anything you can do to use space efficiently is going to be more important than workflow.
  • If you can put all your dust generators close together, your dust collection system can be smaller, and it will work better.
  • You need enough room around your tools to run the material through them. For example, to rip an eight-foot board on a table saw, you need eight feet of open space on the infeed side of the saw, and another eight feet of open space on the outfeed side. Same for your jointer, and your planer, and your bandsaw. This consideration alone may constrain you to a very limited set of options.

Bottom line here is that most of us have enough trouble trying to cram all the tools we want into the space we have that workflow becomes a kind of secondary issue.

-- Russ

  • Author

Okay, conveyor belts to move the projects between stations are out. ;)

I agree that workflow is important for a hobbyist, but not paramount. After all, if I was doing this for a job I'd be evaluating the time each operation takes and seeing how I could save time as well as materials. Since this is a hobby, I know that I'm going to waste time learning how to do things, and trying other methods, and buying tools that intrigue me. That's okay.

Okay, conveyor belts to move the projects between stations are out.

Maybe no conveyor belts, but I've found that a little roll-around cart is really handy for moving parts of a project from one station to another and for storing the parts while you're working on the project. The cart is also good for bringing small tools and supplies closer to your work area when you're working on a larger woodworking project, or under the hood of your car, or whatever.

The only problem with the cart is that (like everything else in your shop) you have to store it somewhere.

-- Russ

  • Author

And keep it from piling up with stuff so there's actually room for your parts.

  • 1 month later...
  • Author

Ordered a Jet 12" jointer/planer with the helical head. I'm a little shell-shocked to be spending that much on a tool, but think I'll be happy with it.

Still in waiting pattern on the air conditioning. The HVAC guy I was dealing with flaked on me and I've been working a ton of overtime, party to pay for the monster jointer. I need to track down a different AC guy so I can get started on the layout.

I use Sketchup and find it invaluable. The 3D Warehouse has loads of pre-drawn woodworking tools and machines (some Grizzly ones too). If specific ones aren't there you can measure what you have got and just create a cube with the overall dimensions and move it around.

  • 2 months later...
  • Author

The Jet came in, with the help of a liftgate truck and pallet jack. I mean this thing was heavy! After getting it into the shop I then had to figure out how to get it off the pallet and onto it's mobile base, hopefully in one move if possible. At 400lbs+ I wasn't going to be lifting it by myself and didn't find any good handholds since I was reluctant to lift from the infeed and outfeed tables. I finally came up with a Rube Goldberg contraption involving a motorcycle ramp run under the base, 2x6s on one end, and a high lift jack for my jeep on the other. I was able to lift it up and remove the pallet from underneath, then fairly smoothly lower it onto the mobile base. Ugly but it worked.

I ended up waiting on the AC. Mostly because the quote was higher than I wanted to spend at the time, and the heat of the summer was already going. I finally settled on a shop layout using the Grizzly layout tool, but ended up having to move stuff around in the actual space to be able to visualize if it would work.

My next problem is storage, or lack thereof. The two shelf units I had before are totally full of motorcycle junk and paint. I plan on building some custom shop cabinets but ran into a chicken/egg problem, I don't have enough room to make cabinets with all the stuff taking up my floor space. I went around to the Habitat for Humanity Re-store and a used office supply store, looking for used cabinets for the shop, but didn't find anything the right height for counter space, or as inexpensive as I would like for temporary use. Went around to Home Depot and had the same problem, the purpose built garage cabinets were too expensive for my taste, and was about to pony up for some bathroom cabinets and counters, but the price was getting a little expensive for a temporary solution.

Right before I gave up I looked at the shelf units I had purchased before. I currently have two of them at 6' tall, but noticed that you could also break them into two halves and make a 36" counterspace. If I take a cheap 6' bathroom countertop and secure it over the two halves, I should have some temporary space that allows storage below, and a place for my benchtop tools on top. This will allow me to get benchtop tools off my workbench so I can build a miter station. At $60 for the shelves and another $60 for the countertop they were in the right price range for a temporary arrangement. And they'll be able to be used at shelves at a later date when I replace them. I decided to get at 4' wide unit as well as the two 3' wide units, I think I'll be set for countertop space and storage for awhile.

  • 1 month later...
  • Author

Some new photos of my shop as it stands right now. I've decided to try it in this config for a little bit and see how the workflow goes, then build counters to increase storage. Of course, I welcome input on the choices I've made and am open to better ideas. This is the third config so far.

8286284534_039ca44b9e_c.jpg

Standing at the doorway, the workbench is against the wall on the right. It's mobile, so might be moved from the wall into the center of the floor if I need the space.

8286285210_baebab2218_c.jpg

Planer and bandsaw in positions where they can be used in location or moved for increased infeed and outfeed distance. The area behind that is currently motorcycle storage. The sheet goods rack is mobile and rolled up towards the garage door except when it needs to be accessed.

8286286526_8a1aa1b970_c.jpg

The miter saw is currently on it's mobile base, eventually to be a cabinet, the table saw is buried against the wall behind the sheet goods rack unless it's used. The saw has 11' of room on the right, and 5' on the left for lumber to be cut. The door can be opened to cut longer timbers to the left, or the garage door to cut longer on the right, but I don't anticipate needing to do so.

8286287194_41e23ce681_c.jpg

Looking back at the doorway, that wall space will be covered with french cleats and used to hang those garden tools, as well as the clamps that are currently hanging off the wood rack. Over the workbench will be some variation of tool cabinet for hand tools.

8286283942_fb2ca2601e_c.jpg

Closer view of the wall to the left of the workbench. I plan on hanging cabinets towards the top of the wall overhead the tool benches. The craftsman tool chest currently holds most of my tools, and will be replaced by and expanded tool bench and emptied of most of the non-automotive tools, and then moved into the motorcycle corner. The lathe and oscillating sander are sitting on an old hobby bench, eventually to be a expanded to take up that corner.

8286283328_c7ec614b0a_c.jpg

Closer view of the dust collection system. The trash can is a poor man's cyclone, and currently under a shelf unit.

8288488392_6cf96f4f54_c.jpg

Flammables cabinet just arrived this morning, it's just enough for the oil based stuff.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Who's Online (See full list)

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,010 Total Members
  • 3,644 Most Online
  • Lolli4 Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.