I have a friend having a local handyman redo their bathroom shower. I saw the in-progress state last week and a few things didn't look right. Rather than bring it up on the spot and create a potentially-unnecessary battle with the handyman (who is also their friend) I thought I'd see if anyone here could let me know if what I saw was OK.

 

I know that often, there's a difference between 100% by-the-book and 'good enough to get the job done.' But some of this looked like a potential future problem.

 

The shower is being tiled with 12x12 porcelain tiles. The grout line would be 1/4 inch or so, requiring sanded grout. On the wall where the shower head was, he had cut out most of the existing drywall and replaced a section with the purple, moisture resistant drywall. However, he didn't replace the entire wall. He went up to just under the shower head and all the way to the back corner of the shower. In the front edge of that wall, where the glass doors would be attached, he stopped short about 6-8" with the purple drywall. Regular drywall that was existing went all the way to the front edge. It looked like he was just focused on putting moisture-resistant drywall where water was most likely to hit.

 

There was about a 1/4" gap between the regular drywall and the moisture-resistant drywall. He did not tape and mud the gap, instead, a 12" tile was straddling it. The tiles were glued directly to the drywall. There wasn't any type of rubber membrane or moisture barrier like I've seen used in the DIY shows. (But I also know that sometimes those shows are just intent on showing a sponsors product.)

 

I've done a lot of tiling, but never a shower. But to my untrained eye, it looks like it's only a matter of time before water seeps back there and causes a mess.

 

Am I right on this? Or is this accepted practice?

Posted

You get what you pay for, when doing any job be it tile or roofing or what ever you always consider the worst case scenario, it doesn't sound like this guy has done that. I would have used hardie board for backer I would never have went directly over dry wall that stuff wheather it is water resistant or not eventually turns to snot when water infiltrates between the tile and, the drywall. But the question is do you want to get involved between friends this friend trusts the handyman so if it was me I would just ask questions like "I was watching a DYI show and they used Hardie board for backer instead of drywall wouldn't that be more water proof, I'm just curios". Than once that's out in the open let them figure it out wash your hands of the whole thing unless your friend asks for your opinion. 

Posted

No one seals grout in the shower so it will leak eventually, especially with a 1/4 inch grout line.  Mike Holmes thinks using only cement board is minimum code, and because of that never uses it or advises it.  If anyone knows Mike he always installs a Schluter shower system!  But since it's already built I would thinset a Schluter waterproof membrane over the drywall/resistant drywall, then tile.  You can get a roll at Lowes, but it is a little pricey.  But so is redoing the shower every 5-10 years because of a moldy shower. 

Posted

When I prepped my shower for granite, I ripped the drywall off, tacked up plastic, covered in backerboard.  The drywall has no place there.

 

The lack of backerboard is definitely a red flag. For one, if you are installing tile on the bathroom floor, you are required to put a waterproof membrane down in case of an overflow with standing water.  That's for a floor in the off chance water sits there awhile; a shower is worse! As you mention, it'll be sanded grout; at least unsanded is more like caulk, but I wouldn't trust that, either.

 

We had a "pro handyman" live across the street. When he moved, completely coincidentally, friends of mine moved into his house.  It is a disaster of half-ass repairs and 'improvements'.  I think some people think they can be a pro handyman if they DVR the DIY channel.

Posted

Yea, you would think a show dedicated to home improvement would occasionally have some good advice.   

Generally speaking, people really have to look behind the intent when they want to empower themselves.   

Posted

When we redid our master bath years ago, I did all the work except the actual tile work. Our very good tile guy instructed to put up green board with a layer of cement board on top. We did not bother taping and muding the joints however. I'm sure the thinset filled those small gaps.

Posted

It's good stuff PB, completely waterproof.  Tom Silva says you don't even have to tile over it.  How colorful would that be?  

Anyway, I wouldn't try that with cement board!

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Who's Online   1 Member, 0 Anonymous, 29 Guests (See full list)

  • Forum Statistics

    32k
    Total Topics
    437.5k
    Total Posts
  • Member Statistics

    26,007
    Total Members
    3,644
    Most Online
    FurniCore
    Newest Member
    FurniCore
    Joined