Skip to content
View in the app

A better way to browse. Learn more.

Wood Talk Online

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Shop finishing time.

Featured Replies

After i had finished up the electrical, and putting up sheetrock. I needed some woodworking time. It's time to finish the rest of the shop and get it over with. Build some cabinets, etc.

Here we go....

Taped corners, and time to spackle.... I hate spackle more than Eric hates sanding.

17183e2ecdf60500c92cd9460c8e7528.jpg

  • Author

My dad's got plaster skill. He's probably put up over 1000 gallons of joint compound in his day. I've done about 10. 

T, are you going to texture the walls?

  • Author

T, are you going to texture the walls?

 

Just gonna be flat and painted. I already have 1.75 walls 100% finished I have to finish that corner and the adjacent wall. The adjacent wall is the ones that needed the most plaster work as I had cut strips of sheetrock out for running electrical in the studs, run wires for the light switches, etc. The other wall was simple since it was all new sheetrock and minimal coverage needed.

 

1662016_10153879436580790_70895332_n.jpg

 

1796687_10153879436650790_308302219_n.jp

 

1524564_10153966801510790_1938475799_n.j

  • Author

He's the foreman. I'm the hired help. I did all the electrical, all the insulation, the painting and such after work. On weekends and some nights he'd come by and plaster and help me put up the drywall, do the taping, and check my wiring and work. He told me all the time growing up "you should never have to pay someone to do something you can do yourself, because in the end you can take pride in knowing you did a good job, you did it right, and if you F$%^& it up you can only blame yourself." For grins I had an electrician friend give me a quote of all the work I did for the electrical as if he was doing it. Materials and labor estimate was $6500. I did the electrical in 3 weekends for less than $1000 and that includes all the sheetrock, plaster, paint and materials for the entire job. Including light fixtures, bulbs, etc. Overall I will say so far a great learning experience, especially since it's my first home, and doing all this work myself and with the help of my dad has been great. Him and my uncle had a kitchens and bathrooms company they ran doing all sorts of stuff. I've got access to tools for any and every type of renovation there is. Right now there's a pipe vise in my utility room of my basement. I've threaded black pipe for gas lines, sweat copper pipe for water, installed showers, toilets, etc. On some levels I enjoy it, on other levels I absolutely hate it. Of all the crafts, woodworking is the one I truly love.  

It's nice to work with your dad while you still can.  My dad's getting up there in years and can't do it like he used to so, I enjoy the few hours I get with him in the shop!

He's the foreman. I'm the hired help. I did all the electrical, all the insulation, the painting and such after work. On weekends and some nights he'd come by and plaster and help me put up the drywall, do the taping, and check my wiring and work. He told me all the time growing up "you should never have to pay someone to do something you can do yourself, because in the end you can take pride in knowing you did a good job, you did it right, and if you F$%^& it up you can only blame yourself." For grins I had an electrician friend give me a quote of all the work I did for the electrical as if he was doing it. Materials and labor estimate was $6500. I did the electrical in 3 weekends for less than $1000 and that includes all the sheetrock, plaster, paint and materials for the entire job. Including light fixtures, bulbs, etc. Overall I will say so far a great learning experience, especially since it's my first home, and doing all this work myself and with the help of my dad has been great. Him and my uncle had a kitchens and bathrooms company they ran doing all sorts of stuff. I've got access to tools for any and every type of renovation there is. Right now there's a pipe vise in my utility room of my basement. I've threaded black pipe for gas lines, sweat copper pipe for water, installed showers, toilets, etc. On some levels I enjoy it, on other levels I absolutely hate it. Of all the crafts, woodworking is the one I truly love.

Sounds like you, and your Dad, and I would get along just fine. The first house I built 41 years ago, I used a lot of

subcontractors. Since then, as you found out pricewise, I've done everything myself, except for installing HVAC equipment.

  • Author

Sounds like you, and your Dad, and I would get along just fine. The first house I built 41 years ago, I used a lot of

subcontractors. Since then, as you found out pricewise, I've done everything myself, except for installing HVAC equipment.

We're all named Tom as well.

Kev,

for about 7 years my dad lived in NYC while I was in Virginia. I saw him about 6 times a year. After he moved here I've seen him 3-4 times a week, he's gonna be 68 in a few months, the last 2 years he's lived here I really appreciate and cherish the time I get to spend with him.

We're all named Tom as well.

Kev,

for about 7 years my dad lived in NYC while I was in Virginia. I saw him about 6 times a year. After he moved here I've seen him 3-4 times a week, he's gonna be 68 in a few months, the last 2 years he's lived here I really appreciate and cherish the time I get to spend with him.

 

Sounds like you and I are in about the same boat.  My dad's a little older but, I sure do appreciate the time I get with him!

Looking good!  I have high ceilings as well and an airless was just the ticket!

Painting sucks and ceilings suck more. You can get 18" wide rollers which helps speed things up. And beer helps a little too.

But when it's done a nice bright shop is worth the pain.

I have half of my garage done, insulate and painted. Really dreading doing the other side.

  • Author

I have half of my garage done, insulate and painted. Really dreading doing the other side.

 

Pug,

 

That's exactly how mine was. Had half of it completely done and painted. Once I had the walls closed back up and the electrical was working, I didn't want to deal with the other side. Once this section is done, there's only half a wall left and then the ceiling. I can't wait for it to be complete. The ceiling needs all new tape since it wasn't taped right when they built the house. The builder put plaster then threw paper tape on the wet plaster and left it, so it is all peeling. I've replaced it with the fiber grid type tape.  

Pug,

That's exactly how mine was. Had half of it completely done and painted. Once I had the walls closed back up and the electrical was working, I didn't want to deal with the other side. Once this section is done, there's only half a wall left and then the ceiling. I can't wait for it to be complete. The ceiling needs all new tape since it wasn't taped right when they built the house. The builder put plaster then threw paper tape on the wet plaster and left it, so it is all peeling. I've replaced it with the fiber grid type tape.

I have drywall up on the non insulated side, so I get the bonus round of having to do demo first - ug.
  • Author

First coat done. Debating on staying up until 1am for the second coat so it's done in the morning. I also put wood filler in the nail holes for the door moulding going into the house. That moulding will be painted black to match the outlet covers.

521808f96a7c13756eb5bfcad1e29b07.jpg

First coat done. Debating on staying up until 1am for the second coat so it's done in the morning. I also put wood filler in the nail holes for the door moulding going into the house. That moulding will be painted black to match the outlet covers.

 

 

You sound like me!  I have some epoxy curing on a live edge project and will probably keep my shop open till about midnight so I can get the topper coat on..

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Who's Online (See full list)

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,010 Total Members
  • 3,644 Most Online
  • Lolli4 Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.