Standing Seam Roof install how-to

Featured Replies

  • Popular Post

I'll start with the hard part-putting on the ridge cap. 

The panels themselves are easy.  I get the design with the built-in screw flanges on one side.  The screws are covered when the next panel snaps over the part of the standing seam beside the screw flange.   Panels come up to 40 feet long, from some manufacturers.   Covering the large area of a roof is the easy part.

To attach the ridge cap, "Z-strip" pieces are screwed into each panel.  The "Z" has two 90 degree bends in opposite directions.  They need to be put on in a perfectly straight line.

There are various methods to install the ridge cap onto the Z-strips.   I use the sliding method, because there is no further crimping needed.  Once the cap pieces, which typically run about ten feet long, are in place that part of the job is finished.

First, as in so many cases when building something, you start by "pulling a line" to set the individual pieces to.

The first picture shows what you end up with once all the  Z-strips are installed on one side.

IMG_0808.JPG

The following pictures show the order, and procedure.

Start by laying out the individual pieces at the top of each panel, on the ridge.  I prepunch two holes with a Whitney punch.  It's much easier to run a screw through only one layer of the metal.  Lay the two screws you need in each piece, as in the picture.

IMG_0809.JPG

Starting at one end, put the piece in position using the line, but don't touch the line with it.  Any touch of the line when using a line will throw it off.  Hold it in position with the impact driver, so it frees up your other hand to pick up a screw.

 

IMG_0811.JPG

Now you can pick up a screw, hold it in position to free up the hand on the impact driver.  On a house, I would run a bead of sealant under the strip along the screw line. 

IMG_0813.JPG

Once all the strips on this side are screwed down, you will have something that looks like the first picture.  This goes right along using my procedure.   A 73 year old carpenter, in 1973, told me once, "Building something ain't about knowing what goes where, it's about getting the pieces in place the easiest way". 

Once the first side is done, that will be used to slide each piece of ridge cap along.  Hold it where you want it, and notice where it ends on the ridge.  Move it back past that point, and start it in place, sliding onto the first piece it comes to, going towards where you want it, but don't go past where the first screw hole is.  Use the ridge cap piece to show you where to put the screws on the other side.

 

IMG_0814.JPG

Start with one end piece, and do the other end the same way.   Do however many whole pieces you have this way, and you will end up with some odd size piece, smaller than the ones you've installed.  Cut that piece to the length you need, and install it the same way as the others, but it will need to slide over one of the already installed caps.  I use clean release duct tape on top of the already installed cap that the last piece will slide on, and rip it off when done.

Some people overlap the caps, but you have to cut off the exact same amount of edges on the piece that slides under.  I like joint covers, since I can get a neater job with no puckers, but I didn't take a picture of a joint cover-I'll try to get a pic next week.

More to come, but I need to take some more pictures.

Installing the ridge cap on the 44' long boathouse roof, this morning, took me a little over an hour.  That's when I took these pictures with my phone.

More later.

I will never install a steel roof (or any other kind) but I certainly enjoyed reading about it.

Thanks for sharing! I have never done a metal roof but great info if I do or if I pay someone of how it should look when done right.

Looks good Tom. I did allot of shingle roofs back in the day but only two like the one your doing.  I like the ridge cap you are using.    I see you have some kind of house rap that went on roof first.   Did you also have to strap the roof?  

  • Author

This was a Re-roofing job.   See page 17 of the "what did you do today" thread.   I have some pictures somewhere of the lower edge folding, that I should be able to post tomorrow.

The membrane was just some synthetic roof wrap.  On the house, I used the much thicker Ice and Water shield (not the thin black kind), but for a boathouse, this was good enough.

The only other standing seam metal roofing I've done, other than the complicated house roof that belongs to the same owner as this boat house, was a copper roof in 1991, and some additions on our house.

I don't normally do roofing, other than Cypress Shingles on really old houses, but do get called to find, and fix, leaks, from my reputation for being able to, I guess.  I tell people to start with that I don't want to do it, so charge a premium price, but once in a while there will be someone who only wants me to do their roof job anyway.

Here's a picture of the ugly house with the complicated roof that we did last Fall.  It has three prow gables, intesecting gambrel roofs that have a low pitched roof between, and below the main roofs, two dormers, etc., etc.   The house was poorly designed, and poorly built, but on a great lot.  It has 10 skylights on it.   I'll post pictures of the skylight install too.  I folded the raised curbs into the panels, in a not at all standard way, and there are now no curbs above the skylights.

It looks a lot better with the standing seam roof on it, than it did with asphalt shingles melting down on the nails, with numerous makeshift repairs.  That dormer window looks better with the window hidden behind the flag too.  The board walk goes down to the boat house.

IMG_0799.JPG

  • Author

Pictures coming in this morning.   Here's one of this metal company's "ridge cap connector".   They're so easy to use, fit perfectly, and you can't even see them from the ground unless you know they're there, and look hard.   The edges are bent straight down to start with.  I cut them where they go over a standing seam, and fold that part up, before installing it, with a pair of needle nose pliers.  When you crimp the edges up, putting a little extra up pressure presses the ridge cap up against the connector perfectly.

When ordering ridge cap, or eave drip edge, and other transition parts, you measure the angles needed, and specify when you order it.   This roof had a slope of 14 degrees, so I specified 28 degrees for the ridge cap, and connectors.  The connectors are 2 dollars a piece.

The only place I don't use them is on a hip cap.   I don't like to depend on sealant anywhere to keep water out, but of course, I do use it.

more pictures tonight of my lower edge method

 

IMG_0844.JPG

  • Author

All the pictures didn't come through, so I'm resending them to our computer again.  In the meantime, here's an edge folder I made.  There are a number of commercial ones available, usually for several hundred dollars a piece, but I like this one better anyway.  No brags about the welds.  I used the flux-cored welder because it was easier to get to, and I can never make a pretty weld with it.  It will stay together though, and works like a charm.

2 - 15-1/4" lengths cut from a 3' steel angle iron from Ace Hardware, and two of the largest sized ViseGrips I could find-maybe 35 bucks, and does a perfect job.  Clean release duct tape, on both pieces of angle,  provides the finish protection.

The panel edge beyond the folder has been turned down-the first step in folding the eave edge.  You might notice it's a really nice fold.

The nearest panel has been trimmed, to be ready for the folder, but hasn't been folded yet.

This is a little out of order from having the different steps in order, but it will make sense later.

The three foot wide walkway below is to be able to put the cover on, and off, of a boat hanging on the lift under the roof.  With the roof overhang, there was not enough room to work on the eave off the little walkway, so we cobbled up cantilevered arms to hold a 12" x 24" walkboard.  We didn't want to carry a heavier, wider one down the hill to the boat house.  This one weighs 75 pounds, and the longer, wider one weighs 176 pounds.  Since I couldn't access the whole edge at one time, or at least without having to hump another plank down the hill, the straightness of the finished eave depended on putting the drip edge on perfectly straight, and measuring off that-to be covered in another post.

IMG_0833.JPG

  • Author

There's no limit to the ways that the lower edge can be dealt with.   People who install standing seam roofs every day have a $20,000 dollar machine, on a dedicated trailer, that will cut, and cope the whole end in one pass, and then fold under the edge.  Since anyone reading this is like me, and may, or may not do one once in a while, a more low buck approach is needed.

The typical heights for standing seams are either 1-1/2", or 1".  Since the main house that this boat house roof matches was very complicated, including a special transition piece at the change of slope on the Gambrel roof, I decided to go with the shorter 1" standing seam.   A 1" seam is actually a little harder to cut in place with tin snips, than 1-1/2".  If you start noticing standing seam roofs, like when you go into a restaurant that has one, you will see a variety of methods to handle the ends of the seams.

What you don't want to do, on this type of metal roof, is to make any cut in place, on the top, with a power saw, or abrasive wheel.  Hot chips will melt the fancy chlorofluorocarbon coating wherever a hot spark hits it, which will later rust.   This includes cutting plumbing vent holes with a holesaw from the top.   A metal cutting blade in a circular saw is great for cuts like the angle cuts in a valley, but they need to be made from the back.

Another problem we have on the lake, is wind.   It's not unusual at all to have winds above 20 knots, which will whistle loudly across open ended standing seams.

With these things in mind, I came up with my own method of cutting the standing seams to length, and sealing the ends from whistling in one step.

 

IMG_0823.JPG

When I give the order for panel lengths, I add a couple of inches, to have some to throw away.  When building things, if you try to order exactly what you need, like concrete, cut wire lengths, 2x4's, etc., etc., without ordering enough to have some to throw away, at some point, you will come up short.

The standing seam cuts need to be in a perfectly straight line.  There are several ways to do this.  One is to pull a line, like you saw above in the cap strips install.  The trouble with pulling a line on this, very slick surfaced material, is that it's almost impossible to clamp the ends of the line in place, and get it to stay there once you put a lot of tension on the line.  For the cap strips, I put a screw into each fascia, pulled the line very tight, and used clean release tape, and twigs to hold the ends of the line exactly where I wanted it-sorry I didn't take a picture of that.

Since this roof was more trouble than it was worth to be able to walk the whole length on a plank, I made sure we put the drip edge on straight, that the roof panels need to be folded around, and measured off of the drip edge.

I like to leave a 1/4" protrusion of the standing seam beyond the drip edge.   The panels are fastened tightly in place by the screws into the cap strip, at the top, so any expansion and contraction has to be at the bottom.  This is not the place to use your Starret.  When I make the cut with the bolt cutters, I sight the vertical pencil line to the outside edge of the cutter jaws, and it leaves me the 1/4" overhang I want.

 

IMG_0822.JPG

The bolt cutters won't cut the seam all the way in two, but almost will.  Using left, and right handed snips, cut to the crimped vertical spot from both sides.  Rather than pick up and put down tools so many times, I do the same operation with each tool, all the way down the line, and then change to the next step. Once the side cuts are made, coming in at an angle, the little "airplane" shaped piece can be wiggled out.

The step after that is to mark where you want to cut the panel, to be folded under.   The drip edge I use extends 1" out, so I cut a 7/8" piece to fold under.

 

 

 

IMG_0828.JPG

Then you cut off the few inches you ordered to throw away.  If it's way up in the air, I'll use electric shears.  They don't make as pretty an edge as I can cut with snips, so on a lower edge, I'll use snips that make about a 3" cut.  Don't cut all the way to the end of the snips, by closing the jaws all the way, or you will leave a jagged edge.

The next step jumps up to the folders that I posted a picture of earlier.  The protruding 7/8" is folded straight down, which is the limit of my folders.  The hanging down part is pushed up with my thumbs enough for the folders to work again.  Doing the same operation, all the way across, eliminates having to adjust the ViseGrips but one time for each operation.

The fold is finished with the folder by squeezing the panel end all the way back up under the drip edge.  For some odd reason, if you wiggle the folder a little bit, up and down, after closing the ViseGrips, it leaves the folded under part perfectly smooth.   If you just clamp it, and then unclamp it, for some reason it will leave waves in the folded under part.

For this last press with my folders, they are placed right at the edge of the fold.   What might look like the edge of the roof in this picture is actually part of the hull of the pontoon boat on the lift below.

 

IMG_0837.JPG

At this point, the only thing left to do is snip off the little sharp point, at the top corner of the standing seam, as seen in the picture above, and then go along with a hammer to tap down any meathooks left from wiggling off the "airplanes, and where the seam corner was snipped.   Once those are all safe, the only thing left to do is take the scaffolding down.

 

IMG_0838.JPG

It looks better from the ground.  You can see in this picture where the vertical pencil mark was made using the combination square, and the overhang left by sighting the edge of the bolt cutters.

As complicated as this seems, a straight, simple gable end roof goes along fairly quickly.   For any complications, like dormers, or valleys, the amount of work, and time required goes up exponentially.  This 1356 sq.ft. roof, just for installing the metal, took the two of us not quite three days, but that included getting everything up and down the hill.  The panels came in two cases.  I used the leftover plywood 20" wide pieces to make a trail down the hill, for us to skid the cases off the trailer, and down as close as we could get them using a riding lawnmower for the tow motor. Otherwise, it would have been 66 trips up and down the hill to tote each panel.   The last 44' eave, shown in this last set of pictures, took us, start to finish, including getting the plank up and down the hill,  building and disassembling the support arm/scaffold for the plank, to back on the trailer, from 8 in the morning, until we pulled out at 11:30 to go get lunch.

There is no standard, or required way, to do any of this.   Feel free to come up with your own methods.

  • 8 years later...
  • Author
  • Popular Post

I needed to find this thread this morning to send to a friend, and realized I never put a finished picture in. Here is a picture of the boathouse with cupola I built for it.  The top of the cupola hinges open to be able to access the solar LED light in it.

 

IMG_3268.JPG

IMG_3269.JPG

Tom, I have enjoyed (and learned from) your threads and posts ever since I joined here.  Always a pleasure.  I will probably never get to North Carolina in this lifetime but if I ever did, I would cross the state to pay you a visit.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Who's Online (See full list)

  • There are no registered users currently online

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,010 Total Members
  • 3,644 Most Online
  • Lolli4 Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.