Recommended Posts

Posted

If I'm working with kiln dried dimensional Douglas fir, at what stage do I let the wood acclimate?  I figure I should assemble the project as soon after milling as possible.  I'm planning to rough cut blanks before milling.  Do I sticker the boards and let them acclimate, then do the rough cuts, mill and assemble?  Or, buy the boards and cut them into rough blanks, let them acclimate, then mill and assemble?

I figure that the rough cut blanks will have more surface area to lose moisture.  But I've always heard you should sticker the boards with weights to let them acclimate.

I don't have the patience to let them acclimate twice.

(I suspect that I'm over thinking this and it doesn't really matter.)

  • Like 1
Posted

I live in an area that has a pretty stable climate.  I still make the occasional lumber run but most of my stock has been in the racks for years.  Still, stress release when cutting can give you unexpected results. Pecan and mahogany have given me the most extreme reactions when ripping thin (1-1/2" to 2-1/2") strips for frame parts.

Like Ron, my usual is to cut blanks to an oversize dimension.  This is relational; small parts I cut with an extra 1/4" or so, larger parts get more extra.  Nothing specific.  This does a couple of things for me.  First it allows for any bow or curve that may result from stress release.  Second it makes the piece of material smaller so that the following milling steps are dealing with less variation if present.  That is, a 1/4" of bow over 4 feet becomes much less if the piece is cut into a pair of 2 foot pieces; if that makes sense.

Wood is a natural product and will try to do what it wants to do.  Still I do clamp oversize and finished size parts to a reference surface until I assemble them.  In my mind I know this probably isn't "controlling" anything but it makes me feel better :)

  • Like 2
Posted

What I figured out from going through the process of air drying wood for my workbench is wood dries very slowly (I know, Captain Obvious, bear with me...). What this means is that all that is going to happen in most acclimation times of a few days to a week is the loss of a little surface moisture. If it's rough lumber and you are just going to mill the surface away, I don't see the benefit of acclimation - it's just not going to dry the wood deeply enough to matter.

What I found worked for me was to not mill and cut the final joinery all in one day. It will move after you work it and expose the wetter interior wood. Mill it close to final (or rough cut the mortise or tenon or whatever joinery you are doing) and then pause and let it dry before going to final dimensions. It will shrink or move on you at that point, and then do your final cuts. HTH

 

  • Like 1
  • Thanks 1
Posted

"kiln dried dimensional Douglas fir" is not 8% kiln dried hardwood and a few days acclimating isn't going to do anything for you either way.  Leave it in a rack until Spring or do whatever you want and hope for the best.

  • Like 2
Posted

I’d rough-cut the boards slightly oversized first, then sticker and weight the blanks in your workshop until they acclimate. Afterward, mill them to final dimensions and assemble promptly to minimize movement and reduce the risk of warping.

  • Like 2

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.