Popular Post gee-dub Posted July 30 Popular Post Report Posted July 30 Queue the Tim Taylor grunt . . . Glue spreaders . . . arf, arf, arf. 4 Quote
Popular Post Von Posted July 31 Author Popular Post Report Posted July 31 First half of the top out of the clamps and second one in them. I was brave enough to snap a glue picture this time. A big thank you to everyone who recommended a roller for the glue - a 4" foam roller spread the glue nicely. Oh, and a big thank you again for the recommendations for the rolling Huskey table - there is no way I could move around the double boards without it. 6 Quote
Popular Post Chestnut Posted July 31 Popular Post Report Posted July 31 On 7/29/2026 at 11:24 AM, Von said: With as much surface area, how long should I allow the glue to set before considering it cured? I'm using Titebond original. Overnight enough or will it need longer In my opinion it depends on next setps. If the next step is to do more gluing, 45 min is enough If the next step is ripping, jointing, or planing then over night is better but even that is over kill. With TB 1 i've done 2-3 hours before with no issues. That's with joinery and a lot less surface area too. Don't ask me about spreading glue i DO NOT use best practices. I squirt it on squeeze the board around and clamp it down. Espoecially for large face to face glues like this..... 2 1 Quote
pkinneb Posted July 31 Report Posted July 31 Lots of great advise above. FWIW I use a roller like some of the others. 1 Quote
Popular Post Chet Posted August 1 Popular Post Report Posted August 1 On 7/26/2026 at 8:02 AM, wtnhighlander said: My general process for milling from rough-sawn is to find the thickest board of the batch, and feed it in (with power off and head raised) to the highest spot, then lower the head until the depth gauge bar touches wood and indicates no more than 1/32" depth. Count turns while opening the head, remove the board, and return the head to the indicated position. This is the technique I use as well. 3 Quote
Popular Post Von Posted August 2 Author Popular Post Report Posted August 2 A milestone today: the new bench took the old bench's place in the workshop. I put some spacers between the stub tenons on the legs so the top pieces sit flat until I got corresponding mortises cut into them. It's starting to look like half a bench. I stated by using my track saw to clean up the outer edge on the top so I could align it with the legs. I cut from the top and then, since my track saw only has a couple inches of capacity, I flipped it over and cut from the bottom. Since the kerf from the track saw is too narrow for any of my squares, I used a thin ruler in the kerf at an angle to set up the second cut. A thin square would be a little less error prone for this - if anyone knows of a thin (3/64" or 1.2mm) square, I welcome a pointer. I almost nailed aigning the two cuts. A little work with a hand plane cleaned things up. The gap between the boards varies from nothing to just enough to fit a finger nail in. Good enough. I then aligned the top piece with the legs, decided on my overhang at the ends, and marked the tenons. I used a forstner bit to hog them out and finished them up with a chisel. First attempt was too tight on one side, second time was the charm. Once the mortises were fit, I transferred holes in the rails to the bottom of the top piece. I was going to drill and tap the holes in the top for bolts, but I stripped out the first hole when tapping it. So I'm going to back off that plan and use threaded inserts instead, requiring a hardware store run. Good time to break for the day. Tomorrow my goal is to get the second top piece similarly mortised and the inside edges of the tops cut for the planing stop. 6 Quote
Ron Swanson Jr. Posted August 2 Report Posted August 2 On 8/1/2026 at 7:05 PM, Von said: A milestone today: the new bench took the old bench's place in the workshop. I put some spacers between the stub tenons on the legs so the top pieces sit flat until I got corresponding mortises cut into them. It's starting to look like half a bench. I stated by using my track saw to clean up the outer edge on the top so I could align it with the legs. I cut from the top and then, since my track saw only has a couple inches of capacity, I flipped it over and cut from the bottom. Since the kerf from the track saw is too narrow for any of my squares, I used a thin ruler in the kerf at an angle to set up the second cut. A thin square would be a little less error prone for this - if anyone knows of a thin square, I welcome a pointer. I almost nailed aigning the two cuts. A little work with a hand plane cleaned things up. The gap between the boards varies from nothing to just enough to fit a finger nail in. Good enough. I then aligned the top piece with the legs, decided on my overhang at the ends, and marked the tenons. I used a forstner bit to hog them out and finished them up with a chisel. First attempt was too tight on one side, second time was the charm. Once the mortises were fit, I transferred holes in the rails to the bottom of the top piece. I was going to drill and tap the holes in the top for bolts, but I stripped out the first hole when tapping it. So I'm going to back off that plan and use threaded inserts instead, requiring a hardware store run. Good time to break for the day. Tomorrow my goal is to get the second top piece similarly mortised and the inside edges of the tops cut for the planing stop. Looking good Von! 1 Quote
Popular Post Ron Swanson Jr. Posted August 2 Popular Post Report Posted August 2 One thing, and I'm sure you're all over it already, but as you're figuring the overhang, make sure you're taking into account your tail vice and any overhang distance requirements that it may have. I don't recall what vice you have for this, but sometimes they require at least X distance from the end of the slab to the base. 2 1 Quote
Popular Post Von Posted August 2 Author Popular Post Report Posted August 2 1 hour ago, Ron Swanson Jr. said: One thing, and I'm sure you're all over it already, but as you're figuring the overhang, make sure you're taking into account your tail vice and any overhang distance requirements that it may have. I don't recall what vice you have for this, but sometimes they require at least X distance from the end of the slab to the base. Thank you! I think I've accounted for that, but there is no substitute for actually holding the vise on the bench and checking. I've currently got some extra, about 6", on both ends that has snipe and other issues which I plan to cut off. I plan to do a physical check for each vise before I do that trimming. 5 Quote
Popular Post Von Posted August 2 Author Popular Post Report Posted August 2 Got the second part of the top mortised and on today. It's starting to look like a workbench! I noticed a couple issues. Two of my tenons have a little play allowing the top to move. I think some shims will take take of that. And when I checked how coplanar the two top halves were, at first I was excited at how close they are: But apparently I chose the only spot where they are that close. Most of the workbench seems to have about an ~1/8-3/16" of difference. So I'll need to sort out what's going with the inconsistent difference. I think there is a little bow in one of the tops. I didn't get to cleaning up the two insides of the tops for the plane stop, but looks like I'm close to a 2" gap, which was the goal. I finished the day with some epoxy pouring to start filling the knot holes in the top (some holes are 2" deep and will take multiple pours). 6 Quote
Popular Post Ron Swanson Jr. Posted August 3 Popular Post Report Posted August 3 Looking good man. For the offsetting slabs, I think most people either rig up a flattening jig and hit with a spoilboard bit in the router, or attempt to tackle it by hand. I did the former. I still had to do some shimming to get the slabs to sit flat, but any differences in elevation between the two were handled with a router. If memory serves, I milled and clamped a 2x6 to each long side to serve as the rails and made a flattening "sled" for the router that rode on those rails. 5 Quote
Popular Post Von Posted August 4 Author Popular Post Report Posted August 4 I started by sanding all my epoxy filling on the top flush. I've decided I'm not going to fill knot holes on the bottom or the sides of the tops as I don't see any real benefit. Then I got my threaded inserts installed for connecting the tops to the rails. Ended up with 3/8"-16 bolts since those fit the 1/2" holes I already drilled in one part of the top. The hole in the rail is 5/8" to allow for seasonal movement. With the bolts in place, it's wonderful how solid it feels. The bolts take care of the play caused by the slop in the tenons, but I still plan to circle back and fix that at some point by gluing shims in the mortises. I removed my diagonal brace and most of the rocking is gone; just a little bit left. Thinking about order of operations for my next few steps, I believe I'm going to hand plane the top flat/coplanar, then clean up the insides of the tops for the planing stop, and then address the tail and shoulder vices, trimming the bench to length as I do those. After that dog holes and finishing. In the meantime, impatience got the best of me and I took it for a quick spin :-) 6 Quote
pkinneb Posted August 4 Report Posted August 4 Awesome job!! Your going to love it! I still enjoy mine both from a user and also as a project I am very proud of to this day 1 1 Quote
Popular Post Von Posted August 8 Author Popular Post Report Posted August 8 Tweaked my back so I've been out of the shop for a few days letting it recover. Got back in a little today and did a few things carefully, including adding some wood to the tenons on my legs so I can get out the play with the top. 4 Quote
Popular Post gee-dub Posted August 9 Popular Post Report Posted August 9 Take care of that back. A little care now will yield a lot better world later 4 Quote
Mark J Posted August 9 Report Posted August 9 16 hours ago, Von said: adding some wood to the tenons on my legs so I can get out the play with the top Will you then need to trial fit to the mortise? Quote
Popular Post Von Posted August 9 Author Popular Post Report Posted August 9 6 hours ago, Mark J said: Will you then need to trial fit to the mortise? Yes. I did that today using my no 78. The usual shaving and test fitting until success. I put a little chamfer on the top of the tenon to help with fit and also let me know when I was getting close. Thinking about why I ended up with so much play, I think it goes back to my wood being a little wet and I keep forgetting it's going to dry and shrink more than I'm used to when I mill it, or in this case cut mortises into it. Anyways, the tenons are fitting well now. With the top secured, I turned to flattening the top. The back half was fairly flat and just a little off level - I'm guessing garage floor has just a little slope. A 1/16" shim leveled it out and I used it as a reference surface for the front half. I used a level and rather than try to keep contorting myself to look under it, I used a 1/32" shim to judge things. I just kept working from one side of the top to the other, marking high spots and hitting them with the scrub plane. I went from putting the level perpendicular to alternating angles. Using advice from Jay Bates and Shannon Rogers, I did alternating planing passes at 45 degrees, which seemed to work well. A couple hours later and it reached flat enough state. One can sneak the shim under the level here and there but in general its sitting flat. I ended up touching up a few high places on the back/right half but 95%+ was on the front half. It still very much needs smoothing to clean up from the scrub plane, but that will wait for another day. 5 Quote
Popular Post Von Posted August 16 Author Popular Post Report Posted August 16 Back at it. I started the day with a relatively flat but very un-smooth surface. I used my No 8, continuing the back-and-froth traversing at 45 degrees And I planed. And I planed. Maybe my No 8 doesn't fit my hands well (it's relatively new to me) or maybe it's how much and how hard I was planing, but I got some good blisters and ended up wearing gloves. Every once in a while I broke out straight edges to make sure I wasn't introducing any problems but didn't find any. My usual 1/32" shim test. By the time I was done this was the worst spot I could find. I admit I was that guy and broke out the feeler gauges: it's about 20 thousandths. Well past good enough (and flatter than I expect it will stay). I finished with a pass with my No 5 set to a light cut. It feels very usable at this point. I'm trying to hit a nice balance of flat but with a little roughness and grip. Just for my own curiosity, I measured the thickness of the top again. There is a little variance, but generally I'm just under 3+3/4". I'd have to go back in this thread and double check, but I recall I was at about 3+7/8", meaning my flatting took off about 5/32". And I got an update from the professor who is taking my shavings and dust: the rhino beetle has emerged from the pupal stage. 4 Quote
Popular Post Von Posted August 17 Author Popular Post Report Posted August 17 Got the sides of the planing stop gap squared up today. Not a big change visually, but another step forward. One of the things I like to think I've gotten better at is thinking about reference surfaces/edges and for the planing stop gap, since having the two sides parallel is important, I referenced everything off the front edge of the bench. I started by making sure it was relatively straight. I started with the inside edge of the back half of the bench. I found what looked like a good line for my track saw that was parallel to the front edge of the bench. And I started cutting and I ran into my big problem of the day. I assumed the track would be rigid enough to span the two inch gap from the planing stop. Well my first clue it wasn't was when the saw got caught up at the joint between my two tracks. With the saw just sitting on the track, everything was fine. When I pressed down on the saw to engage it, there was enough force the track was flexing and throwing things off. So I moved my track so that it was fully supported by the back of the bench. Since I find the the splinter guard on the front lip too flexible for referencing against, I broke out my long combination square and referenced off a handy interior portion of the track. This seemed to work well. I found a thin square so I could line up my track with my first cut to finish the cut. For reasons I don't fully understand I found adding a 1/32" shim offset made this work pretty much dead on. A little hand planing after the second cut and I have a smooth face. I ended up with a ~2+1/4" gap. A little bigger than I was hoping for. I suspect I'll end up laminating the planing stop. Next step is the tail vise. I spent a little time laying things out and deciding where I want to cut the top to length. Right now I'm leaning towards the line made the blue tape, which will give me a bench about 80" long. This is a little shorter than my current bench (84"), so I'm going to sleep on it. 5 Quote
Chestnut Posted August 18 Report Posted August 18 21 hours ago, Von said: I ended up with a ~2+1/4" gap. A little bigger than I was hoping for. I suspect I'll end up laminating the planing stop. I made my gap much wider than typical. I really like the extra space in the middle. My goal was to be able to drop a chisel or rasp through the slot and have the handle drop below the bench surface. In hindsight it was a great idea. I never use the plan stop capabilities of the center till but store chisels or rasps in it frequently. I also store glue rollers and a variety of other items. The storage slots a dead useful in the center of the bench. If i could change anything I'd not have any openings through the center till. Stuff drops through the top hits something on the shelf below and then blasts of sideways into outer space never to be found again among all the space junk in my shop. 2 Quote
Chestnut Posted August 18 Report Posted August 18 21 hours ago, Von said: Next step is the tail vise. I spent a little time laying things out and deciding where I want to cut the top to length. Right now I'm leaning towards the line made the blue tape, which will give me a bench about 80" long. This is a little shorter than my current bench (84"), so I'm going to sleep on it. You can always cut the bench shorter. You can't make it longer. I'd leave it as long as practical. My bench is 90" and i regularly wish it was 10" - 20" longer even though i don't have the space. 2 Quote
Von Posted August 19 Author Report Posted August 19 Well, I think I goofed. When I laid out my top for my shoulder vise, I laid it out so the jaw overlapped the leg, which I figured was no problem. Well, it isn't for the jaw, but if I put dogs in the jaw, the corresponding dogs in the bench top can't overlap the rail behind the leg. So my vise has to shift several inches out to make room for the inner row of dogs. That doesn't leave me much wood (end grain wood at that) between the outter row of dogs and the end of the bench. In the image below, I might have enough room for the dogs. Maybe - it's tight between the vise and the rail. Fortunately, I left plenty of length on the top at the other end of the bench because I was worried about having enough length for the tail vise. So I could shift the top left by 3-6" by making new mortises for the stub tenons on the legs and moving the bolt inserts. As long as that doesn't screw up my flattening efforts, which it shouldn't in theory, not too bad a mistake. Another option as I look at the photo would be to put the dogs inside of the guides on the vise. That seems close together, but I can't actually think why that's a problem at this moment. Going to think this one over for a day or two. I will probably shift the top down to actually lay things out. There is something about actually see things that helps my brain. 2 Quote
pkinneb Posted August 19 Report Posted August 19 On 8/19/2026 at 8:51 AM, Von said: Well, I think I goofed. When I laid out my top for my shoulder vise, I laid it out so the jaw overlapped the leg, which I figured was no problem. Well, it isn't for the jaw, but if I put dogs in the jaw, the corresponding dogs in the bench top can't overlap the rail behind the leg. So my vise has to shift several inches out to make room for the inner row of dogs. That doesn't leave me much wood (end grain wood at that) between the outter row of dogs and the end of the bench. In the image below, I might have enough room for the dogs. Maybe - it's tight between the vise and the rail. Fortunately, I left plenty of length on the top at the other end of the bench because I was worried about having enough length for the tail vise. So I could shift the top left by 3-6" by making new mortises for the stub tenons on the legs and moving the bolt inserts. As long as that doesn't screw up my flattening efforts, which it shouldn't in theory, not too bad a mistake. Another option as I look at the photo would be to put the dogs inside of the guides on the vise. That seems close together, but I can't actually think why that's a problem at this moment. Going to think this one over for a day or two. I will probably shift the top down to actually lay things out. There is something about actually see things that helps my brain. How wide of a jaw are you using? I can't think of a process I've used requiring dogs to be wider then 8-12". Or I could totally be missing your point Quote
Von Posted August 19 Author Report Posted August 19 1 hour ago, pkinneb said: How wide of a jaw are you using? I can't think of a process I've used requiring dogs to be wider then 8-12". Or I could totally be missing your point A Veritas Quick Release Front Vise. The hardware is about 11.5" wide from edge to edge, so my dogs need to be ~13" o.c. apart so everything clears as the vise opens and closes. Quote Another option as I look at the photo would be to put the dogs inside of the guides on the vise. That seems close together, but I can't actually think why that's a problem at this moment. Quoting myself here. This won't work unless I pull the dogs out when I open or close the vise. So this is a no go. I could pivot to a leg vise. Still leaning towards shifting the bench top left 3". 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.