Ron Swanson Jr. Posted March 28 Report Posted March 28 Von is your previous leg glue up behaving itself? Quote
Popular Post Von Posted March 29 Author Popular Post Report Posted March 29 On 3/28/2026 at 2:34 PM, Ron Swanson Jr. said: Von is your previous leg glue up behaving itself? Got three leg blanks to to rough size today. No issues. Glue on the fourth needs more time to cure. So far, just one board has given me a problem, going corkscrew right after being rough cut. 5 1 Quote
Ron Swanson Jr. Posted March 29 Report Posted March 29 On 3/28/2026 at 8:41 PM, Von said: Got three leg blanks to to rough size today. No issues. Glue on the fourth needs more time to cure. So far, just one board has given me a problem, going corkscrew right after being rough cut. Good deal! Sounds like those moisture levels are in a good stable place! 1 Quote
Popular Post Von Posted March 30 Author Popular Post Report Posted March 30 Legs milled. I was aiming for 4" square and ended up about 1/8" smaller. One blank developed a tiny bit of cup during glue-up and needed a touch with the scrub plane before I could mill it. The legs are too big for my planer/sled I discovered after setting it up. Next step is cutting the bottoms and laying out all the joinery. 6 Quote
Popular Post Chet Posted March 31 Popular Post Report Posted March 31 On 3/30/2026 at 11:54 AM, Von said: I was aiming for 4" square and ended up about 1/8" smaller. I think you need to start over then. 6 Quote
Popular Post Von Posted March 31 Author Popular Post Report Posted March 31 On 3/31/2026 at 12:55 PM, Chet said: I think you need to start over then. Anyone got an acorn? 1 5 Quote
roughsawn Posted April 1 Report Posted April 1 On 3/10/2026 at 8:30 PM, roughsawn said: Von, 10% this time of the year (low humidity) scares me. 9% and under, I'm good to go. And when I resaw my 2" slabs, I'll sticker them and leave them sit for 3 or 4 days. Seems they always have 1 to 1-1/2% more moisture in the middle than on the outside. Just gotta be patient. Just think, by this fall, the whole stack will be ready. Good luck with this new project! Von, I have an update that might help to put you at ease, or at least give you an insight. Yesterday, I brought 10 white oak slabs (8' X 9") into the shop, from one of my stickered stacks outside. I milled them January of 2023, and they have been outside...under a lean to since then. I know they are dry. They all measures 10% front back and sides. So, I'm going to retract my statement about being scared with 10%...lol (this time of the year, my roughsawn lumber that is dry is usually at 9%-9-1/2% when I break it down.)They are tucked away in vertical storage, and won't be called into action until this coming December. If I remember then, I'll give a moisture update...both outside and inside. Good luck with the project. 1 Quote
Popular Post Beechwood Chip Posted April 1 Popular Post Report Posted April 1 Doesn't it depend on the humidity in the environment? If you have wood that's really dry and you put it in a humid environment, it'll absorb water and expand. So, it's not a specific %age, it just needs to reach equilibrium in the environment where the finished piece will live. That makes sense to me, but I could be wrong. 3 Quote
Popular Post Ron Swanson Jr. Posted April 1 Popular Post Report Posted April 1 On 3/31/2026 at 3:12 PM, Von said: Anyone got an acorn? Talk to me on Thursday. This is how my company pays me nowadays. 5 Quote
Popular Post Von Posted April 1 Author Popular Post Report Posted April 1 On 3/31/2026 at 11:25 PM, Beechwood Chip said: Doesn't it depend on the humidity in the environment? If you have wood that's really dry and you put it in a humid environment, it'll absorb water and expand. So, it's not a specific %age, it just needs to reach equilibrium in the environment where the finished piece will live. That makes sense to me, but I could be wrong. From my very limited experience, the surface humidity, as read by my pin meter, varies based on the ambient humidity. In other words, the outside of the wood definitely absorbs/sheds water based on humidity. My sense is that that it is very slow to dry/absorb past the surface. I've measured humidity on a fresh cut on my lumber and it's ~2% higher than the surface, but it acclimates down within a day or so once exposed to air. 3 Quote
Popular Post Von Posted April 2 Author Popular Post Report Posted April 2 They look like legs (not cut to final height yet). I spent about two hours yesterday laying out all the joinery and other work to be done. With the drawbores, no two faces on a leg are identical. Hopefully I got everything where is should be and made sure I'm not going to run into a logistical issues with, e.g., two tenons occupying the same space. I do notice one leg is not quite square - leg second from the left labeled "BR" with the gaps between its two neighbors. I'm guessing I missed a corner wasn't quite 90 and then the planer made a parallelogram. I'm going to proceed for now and see what problems I run into. Options would seem to be to plane it a little more, probably by hand, or rebuild it. 4 Quote
Mark J Posted April 2 Report Posted April 2 1 hour ago, Von said: Options would seem to be to plane it a little more, probably by hand, or rebuild it. If you plane it further it will get a bit smaller. Is that a problem? Or the legs don't need to be the same size? 1 Quote
Popular Post Ron Swanson Jr. Posted April 2 Popular Post Report Posted April 2 On 4/2/2026 at 7:43 AM, Von said: They look like legs (not cut to final height yet). I spent about two hours yesterday laying out all the joinery and other work to be done. With the drawbores, no two faces on a leg are identical. Hopefully I got everything where is should be and made sure I'm not going to run into a logistical issues with, e.g., two tenons occupying the same space. I do notice one leg is not quite square - leg second from the left labeled "BR" with the gaps between its two neighbors. I'm guessing I missed a corner wasn't quite 90 and then the planer made a parallelogram. I'm going to proceed for now and see what problems I run into. Options would seem to be to plane it a little more, probably by hand, or rebuild it. Slightly out of square probably won't be too much of an issue. You can use your planes to try and square up just the area around the mortises if it looks like it'll be an issue. The entire leg doesn't need to be 100% perfectly dead square, at least in my opinion. 4 Quote
Popular Post Von Posted April 3 Author Popular Post Report Posted April 3 On 4/2/2026 at 10:36 AM, Mark J said: If you plane it further it will get a bit smaller. Is that a problem? Or the legs don't need to be the same size? If I reference the mortises to the inner corner, it wouldn't be as all my stretchers would stay the same length. But, thinking more about it (and this is in part while I like posting here as it causes me to think), I realized where the error came from. A dumb order-of-operations mistake in the milling process. So I'm going to back up and rebuild the leg, otherwise it will always annoy me. 3 Quote
Popular Post Von Posted April 4 Author Popular Post Report Posted April 4 My planer has been getting a workout and its 2x4 stand had an open top. The shavings, which normally don't amount to much, were building up on the stuff below enough to be a pain, so I took the morning to add a piece of 1/4" plywood below the planer to keep the shavings off the stuff below. Meant a little time remounting the DRO. Also took the opportunity to re-align the infeed and outfeed tables. After that, it's back to milling long rails, short rails, and a replacement leg... I'm find myself going back and forth on whether I need a replacement leg, but I figure I'll build one while I'm in the milling groove and decide later. In any case, a five-legged workbench should be 25% better right? 6 1 Quote
Popular Post Von Posted April 7 Author Popular Post Report Posted April 7 After the planer/planer sled and maybe hand planes, my track saw is the most used tool in my lumber milling process. I use it to get a square edge once I have faces flat. I'm glad I realized a while ago my single 55" track wasn't going to be long enough for my long rails and I bought a second track and connectors. I used those today for the first time and two connected tracks worked well. A bit of fiddling to get everything lined up but no harder than you would hope. One thing I've learned with working with the 2" oak, is where I have tools and dust collections on a single power strip with a breaker, it will trip those breakers unless I go slow and steady. I was able to get rid of these breaker bottlenecks for my planer and table saw, but I don't have a ready way to do so for my track saw. On the the "long-term to do list" and just taking it easy and slow for now. 3 Quote
Mark J Posted April 8 Report Posted April 8 16 hours ago, Von said: where I have tools and dust collections on a single power strip with a breaker, it will trip those breakers Can you run a heavy guage extension cord to another circuit? 1 Quote
Von Posted April 8 Author Report Posted April 8 On 4/8/2026 at 8:30 AM, Mark J said: Can you run a heavy guage extension cord to another circuit? Short version: yes with some planning and effort. Long version: My issue isn't with circuit breakers at the panel but with overload breakers in power strips in my shop. Typically I run a tool and dust collector to a ivac switch, which then plug that into a power strip. I use the power strips because I don't have enough outlets in my garage and I'm a one-person shop so I'm not normally running multiple tools at once. Under normal usage this isn't an issue, but with the load from these 2"+ rip cuts, I'm triggering the overload in the power strips. For my table saw and planer (which share a DC) I was able to do what you suggest, free up an outlet and bypass the power strip and plug the ivac into its own outlet. For the track saw on the other side of the shop, the outlets just aren't available/accessible. I just need to sit down and re-engineer things to free up an outlet in the right place. 2 Quote
Beechwood Chip Posted April 9 Report Posted April 9 Are you using a 15 amp or 20 amp power strip? Would something like this help? 1 1 Quote
Coop Posted April 9 Report Posted April 9 If the power strip is the issue, buy an additional power strip. 2 Quote
Von Posted April 9 Author Report Posted April 9 Thanks guys. Thinking about this, the reality is I haven't re-thought my electrical since I started incorporating dust collection. I've been getting away with it as I don't tend to work with 2"+ thick material often. Thinking about it even more, it may be I should also re-think my dust collection control. Currently I'm using iVac knock-offs that combine the power for the tool and DC into one draw. It could be time for me to invest in some DC controls that let me separate the two power feeds and give me some more flexibility. 2 Quote
fcschoenthal Posted April 9 Report Posted April 9 I got this one about 5 years ago and it has worked really well. It's rated at 30A and right now only $26. The only drawback that I know of is that it's direct wire in and out, but I didn't mind cutting the cord. There are lots of other 15A options for plug and play. 1 Quote
Popular Post Von Posted April 12 Author Popular Post Report Posted April 12 Replacement leg made (at least to the point the others are). Thank you to whomever mentioned this stair gauge trick. 4 Quote
Popular Post Von Posted April 14 Author Popular Post Report Posted April 14 Rails all milled. Hit my goal of a true 2"x4" except for one spot that will go away when I cut the tenons. 5 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.