Skip to content
View in the app

A better way to browse. Learn more.

Wood Talk Online

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Shop upgrade insight

Featured Replies

So we put our house on the market last week and it sold in about 30 hours which was nice, we also looked at a house we really liked the same day.  We've looked at quite a few houses and have made sure to find ones with a shop of some kind for me.  Seems all the houses with decent shops are pretty crappy and would take a lot of money and updating.  Well we put an offer in on this new house and it was accepted, of course won't consider it a done deal until all the inspections for everything is done and closing day comes haha.  The good thing about the new place is the house itself doesn't need a thing, it also has a 30x42 shop all on 5 acres.  Now the negative thing is the shop is your standard metal outbuilding, it's not insulated and it also has a dirt floor but does have electric and a decent sized panel run to it.  So I'm going to have to dig out the dirt and pour concrete.  For the guy's who have had shops built, how thick of a pad was poured for it?  Also was wondering about what everyone would do in this type of situation to make the shop as perfect as can be.  Wanted to keep a small section for mower and just other crap we keep stored away.  Thought about walling a section off to keep everything separated and just insulate the shop part.  Just insulate it all and don't worry about putting any walls or anything inside it.  I'm pumped about moving from a 2 car garage shop, not pumped about having to move everything and pouring concrete but will be worth it.  Thought about putting all of my big stuff on pallets plus everything else in boxes on pallets to be able to move everything with a pallet jack instead of lifting and moving it by hand each time, plus it's going to have to go on the dirt floor once we get moved in since I can't get the slab poured before we own the house.  So basically, what would you do if you had an empty shell of a shop like that and you're turning it into your woodworking shop? 

Too many variables exist to make the concrete call without a site test and design consultation. Find a word of mouth reputable retired contractor in that area to consult with. For coffee or a free meal he might save you thousands of dollars worth of headaches. 

Hmm, that is awesome but i get the concern.  I wouldn't be stoked about a dirt floor either. I'd proabably determine what size I want my shop,  divide it off from the other storage and pour after closing. 

What part of KY are you from?

 

And, when you do your floor, look real hard into heated floors. At least have the tubing ran, you can always hook it up later. 

  • Author
3 minutes ago, C Shaffer said:

Too many variables exist to make the concrete call without a site test and design consultation. Find a word of mouth reputable retired contractor in that area to consult with. For coffee or a free meal he might save you thousands of dollars worth of headaches. 

Yea plan on talking with my father in law and see who he knows, he works for a steel structure contracting company so probably knows people.

4 minutes ago, Southwood said:

What part of KY are you from?

 

And, when you do your floor, look real hard into heated floors. At least have the tubing ran, you can always hook it up later. 

Live in Lexington now, moving to Salvisa which is in Mercer county, around 35 minutes west of Lexington.  I was wondering about the heated floor route but figured it'd be pretty expensive but don't have a clue really haha.

2 hours ago, Gixxerjoe04 said:

Yea plan on talking with my father in law and see who he knows, he works for a steel structure contracting company so probably knows people.

Live in Lexington now, moving to Salvisa which is in Mercer county, around 35 minutes west of Lexington.  I was wondering about the heated floor route but figured it'd be pretty expensive but don't have a clue really haha.

With in floor radiant, some places will let you do the exterior boiler shed. In any case you can pipe in the concrete and add the boiler later. Scraps would all be helpful and you could decide only to heat in the weekends if you chose. A wood stove inside the structure could be nice as well. It doesn't need to be gas or electric. 

Put the big shop stuff in one of those PODS or storage somewhere and get the slab and insulation done first thing. Make sure you keep the tools needed to prep the new shop accessible. Wall coverings and paint long before you move tools in. It's a nightmare to work around the machines . 

When I did mine, I had three estimates, the company I hired agreed to let me do all of the prep work, leveling, gravel, compacting, and forms.  That saved a lot of money, but it was a lot of work for one guy.  It took me about 3 months working nights and weekends, to get it all done. (Only 1 day for them to pour) The company recommended for my use  and area,  that I pour a 6" fiber reinforced slab.  It's been 2yrs now and there are no cracks, it is level and I am extremely happy.  Besides the woodshop, I also park 2 cars, and built a separate store room in the building.  Total size is 1260 sq ft.  The foreman of the company was very helpful, and patient since I did not have a clue...

Congratulations on your new place, sounds fantastic.

  • Author
3 hours ago, Chet K. said:

Have you thought about the possibility of a wood floor.  

Never crossed my mind, guess not really sure about how you'd do that in a shop.  Figured you'd need a concrete subfloor to be strong enough, plus would assume that would be more expensive.

2 hours ago, Just Bob said:

When I did mine, I had three estimates, the company I hired agreed to let me do all of the prep work, leveling, gravel, compacting, and forms.  That saved a lot of money, but it was a lot of work for one guy.  It took me about 3 months working nights and weekends, to get it all done. (Only 1 day for them to pour) The company recommended for my use  and area,  that I pour a 6" fiber reinforced slab.  It's been 2yrs now and there are no cracks, it is level and I am extremely happy.  Besides the woodshop, I also park 2 cars, and built a separate store room in the building.  Total size is 1260 sq ft.  The foreman of the company was very helpful, and patient since I did not have a clue...

Congratulations on your new place, sounds fantastic.

thanks for the info, hoping to do it all myself with help from people I know.  Got one buddy who's friend has a skid steer I could probably rent for cheap but hoping the guy i work with buys one by then.  Luckily got around 45 days until closing to figure it all out, gonna be a lot of work but will be worth it in the end.

Don't do what I did and cheap out. Do the research, find a good mason and get it done right. Ideally you want to do it in cooler weather. Concrete can cure too quickly in summer swelter and crack almost instantly. 

I ran 220v and 110v electric under the slab to the middle of the shop floor for table saw and planer etc... it was expensive to buy the brass cover but well worth it in the end. 

You can buy 8' wide 6" thick blanket roll insulation, I used R19 and 6mil plastic in 10x100 rolls for vapor barrier. 

I partitioned off a 12x24 area and put in a double hung 6' door between that space and the main shop. No regrets doing so. 

Steve is right...heed his advise and get a pod or storage facility. It will be next to impossible to finish that space with tools on pallets in your way. You'll need a stone bed to pour on and there goes your plan, before you even get started. 

I'll "third" the "get a POD' idea.  It's really a good deal - you pack everything up, send it off, pay by the month, and then have it delivered when you're ready.

My floor was poured last week.  It's 4" thick.  I'm in CT and as Carus and others said above, it's probably site-specific.

 

Congrats on the new house and huge new shop!!

40 minutes ago, -MattK- said:

I'll "third" the "get a POD' idea.  It's really a good deal - you pack everything up, send it off, pay by the month, and then have it delivered when you're ready.

My floor was poured last week.  It's 4" thick.  I'm in CT and as Carus and others said above, it's probably site-specific.

 

Congrats on the new house and huge new shop!!

I did the pod thing once and seeing how they load it into a truck, lifting one end up 6' them rolling the truck under,  I would not recommend that for your machines.  It would be nice for on site storage though. 

B, are you saying they tilted one end up?  For me they lifted the whole thing, keeping it level.

  • Author
6 minutes ago, Brendon_t said:

I did the pod thing once and seeing how they load it into a truck, lifting one end up 6' them rolling the truck under,  I would not recommend that for your machines.  It would be nice for on site storage though. 

Yea that's how I've seen them lifted before which is why i figured that wouldn't be a good idea, way too risky. 

When it comes to concrete floors for a shop, I would not use less than 4".  I would have control joints every 10 ft or so in both directions.  The most important part of the floor is really the granular (sand/gravel) base beneath it. That provides even support for the concrete and allows water, if any, to drain away and not wick up through the floor. The base should be a well graded sand/gravel and should be about 6" thick and be very well compacted.  Ify ou have wet soil or a high water table or paln to finish the floor with something than could be affect my moisture consider a vapor barrier (poly) under the slab.  Make sure that the concrete is allowed to cure slowly and properly.  If the surface dries to fast you will get cracks.  The slab should have wire mesh or rebar in it to control cracking.  Another possibility is fiber mesh concrete. (fiberglass or metal fibers in the concrete mix).  If you are not familiar with some of the terminology I used, check with a good contractor who can answer your questions.

  • Author

Our house will be inspected in the next week and was wondering, I ran a 220 outlet for a few of my machines.  I didn't run it in the wall or the "right way" since I planned on taking it out when we move.  With it like that do you all think that will cause problems with the inspection?  I can take it out but then I won't be able to get my stuff done, don't really want to take it out and pull it off the wall then put it back, would be pretty annoying. 

It'll will get noticed, and then they will probably recommend you "fix" it. Could slap something over it to cover it temporarily.

I don't know what the inspector will say or how people will precieve that. If i was the buyer I'd think it's awesome and tell you to leave it. It might make some people nervous and wonder how much other electrical you did at a marginal job that they can't see.

  • Author

I could just disconnect the wires from my panel, then it'd just be random wires hanging on the wall and nothing to worry about since they aren't connected to anything haha.  Maybe put a note on it for the guy.

I would not leave it exposed and an inspector worth his salt would definately note it. 

 

1 hour ago, Brendon_t said:

I would not leave it exposed and an inspector worth his salt would definately note it. 

 

To me it's not if he'd notice it. If he doesn't notice it the guy should be fired because he's a liability. I think it's more what the consequences would be when left. When your instructed to fix it, removing it would fix it. How is that going to effect the opinion of the buyer.

20 minutes ago, Chestnut said:

To me it's not if he'd notice it. If he doesn't notice it the guy should be fired because he's a liability. I think it's more what the consequences would be when left. When your instructed to fix it, removing it would fix it. How is that going to effect the opinion of the buyer.

I guess I'm looking at it from a geographic perspective.  In California,  a surface mounted curcuit would be the equivalent of a foundation crack because very few people out here could even run a new line if their wanted to.  They call a handyman to hang a closet door,paint a room, or change hvac filters . A bunch of girly men out here.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Forum Statistics

  • Total Topics 32.1k
  • Total Posts 437.6k

Member Statistics

  • 26,009 Total Members
  • 3,644 Most Online
  • Joseph b Newest Member ·

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.