Got the upper door veneers done tonight and cut the strips
Got everything ready to go and realized I didn't have a enough Gorilla glue nor the plastic I need to keep from mucking up my vacuum bag with glue squeeze out. so that will have to wait until tomorrow
Got a new mallet and the switch went out on my Shop Fox spindle sander so I got it and a neoprene pad I saw in a semi recent Fine Woodworking. The ones I have slide on my laminate top where I sand, this one actually doesn't seem to so that's good. I wanted it for a while but wasn't willing to pay $11 shipping on a $25 mat. Since I had to have the $6 switch I paid the $11 shipping and added the mat
Got another bank of lights converted to LED's
Just have these two at the front of the shop and I need to decide if I'm going to do the two fixtures in the spray room now or wait until there's an issue. 4' bulbs should be here tomorrow.